Skip to main content
CityRuleLookup

DuPage County, IL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required for
any excavation or fill of land
Grading plan
sealed by IL Professional Engineer
Swale slope minimum
1% along property lines
Discharge setback
10 ft from property line
Max driveway slope
8%

Summary

Excavating or filling any tract of unincorporated land in DuPage County requires a Building Official permit and an engineer-stamped grading plan before work starts.

City-specific rules exist: Naperville has its own erosion control rules that differ from DuPage County's county-level regulations. If you live in Naperville, check the city-specific page instead.

It shall be unlawful to change the occupancy of, construct, add to, alter, relocate, remove or demolish a building or structure, or excavate and or fill any tract of land ... without first filing with the Building Official an application in writing and obtaining a formal permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 14 Update 1).

Full Breakdown

Under Sec. 8-112.1 it is unlawful to excavate or fill any tract of land, or grade a lot, without first filing a written application with the Building Official and obtaining a formal permit. Sec. 8-128.2 then requires a grading plan sealed by an Illinois Registered Professional Engineer showing one-foot contours, drainage swales at a minimum 1% slope, sump pump/downspout lines routed at least 10 feet from any property line, driveway slopes capped at 8%, and erosion controls meeting the Illinois Urban Manual as amended by the Countywide Stormwater and Flood Plain Ordinance. Grading affecting a neighboring parcel needs that owner's notarized consent and may itself trigger a separate grading permit.

Violations & Fines

Working without the required permit is a Building Code violation subject to stop-work orders and fines; unresolved cases proceed through County administrative adjudication.

Frequently Asked Questions

Do I need a permit just to regrade my yard?
Yes. Sec. 8-112.1 makes excavating or filling any tract of land in unincorporated DuPage County unlawful without a Building Official permit.
Does a grading plan need an engineer's seal?
Yes. Sec. 8-128.2 requires plans prepared and sealed by an Illinois Registered Professional Engineer, with one-foot contours and swale details.
Can I direct my sump pump discharge onto a neighbor's yard?
No. Discharge lines must exit at least 10 feet from any property line and cannot negatively impact neighboring drainage.

Sources & Official References

Other rules in DuPage County

All DuPage County rules

Compare DuPage County to another location·View the Illinois environmental rules overview

Get notified when Erosion Control in DuPage County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across DuPage County