Key Facts
- Permit trigger
- 4,000 sq ft disturbance or 200 cu yd excavation/fill
- Permit fee (1 acre or less)
- $100
- Fee, 1-5 acres
- $80 per acre
- Review timeline (under 1 acre)
- 2 weeks initial, 1 week resubmittal
- Inspection frequency
- Weekly and after 0.5" rain events
- Penalty
- $25-$500 per violation, per day
- Enforcing agency
- Office of Public Works, Dept. of Building and Zoning
Summary
Springfield requires an erosion control permit before any construction, land disturbance over 4,000 square feet, or excavation/fill of 200 cubic yards or more. The Office of Public Works, Department of Building and Zoning issues permits after review of a required erosion control plan.
(a)This chapter applies to the following types of land development or land disturbance activities. The following activities require an erosion control permit:(1)Building or construction on any land area.(2)Any land disturbing activity affecting a surface of 4,000 square feet or more.(3)Excavation and/or filling 200 cubic yards or more of ground, sand, or other excavation or fill material...(7)Disturbing any size land area on slopes greater than 12 percent grade.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 82).
Full Breakdown
City Code Chapter 154 requires an erosion control permit for building or construction on any land area, land disturbance affecting 4,000 square feet or more, excavation or filling of 200 cubic yards or more, work on slopes greater than 12 percent grade, and underground utility work extending 300 feet or more, among other listed activities (Sec. 06(a)). Agricultural use, gardening, ordinary landscaping, tree harvesting, and disturbances below those thresholds are exempt (Sec. 06(b)). For sites under one acre, the applicant submits a permit application and erosion control plan to the Office of Public Works, Department of Building and Zoning, which must issue or deny the permit within two weeks, with one-week review cycles for resubmittals (Sec.
07(a)). Sites of one acre or more route through the city engineer and must include the Illinois EPA Notice of Intent and Storm Water Pollution Prevention Plan, with a two-week review cycle (Sec. 07(b)). Permit fees run $100 for one acre or less, $80 per acre from one to five acres, and $20 per acre thereafter, with no transfer fee (Sec. 08). 5 inches or more in 24 hours, and repair damaged controls immediately (Sec. 11). Soil left inactive more than 14 calendar days must be stabilized by mulching, seeding, sodding, or covering, and storage piles over ten cubic yards must sit at least 25 feet from a roadway ditch or drainage channel if left 14 or more days (Sec. 15(c)(9)-(10)).
Violations & Fines
The Office of Public Works, Department of Building and Zoning issues a notice of violation stating the required corrective action and deadline; missed deadlines can trigger a stop work order covering all site work except the correction (Sec. 154.25). Uncorrected or urgent violations let the city perform the corrective work itself and bill the permittee for actual and administrative costs (Sec. 154.25(c)). The Office of Corporation Counsel can pursue administrative adjudication under Chapter 39 or a circuit court injunction, and certificates of occupancy and building permits are withheld while a violation, court order, or unpaid fine remains outstanding (Sec. 154.26). Fines run $25 to $500 per violation, with each day of continued violation a separate offense (Sec. 154.999).
Frequently Asked Questions
When does Springfield require an erosion control permit?
How much does an erosion control permit cost in Springfield?
How often must erosion controls be inspected?
What happens if erosion control requirements aren't met?
Sources & Official References
Other rules in Springfield
Compare Springfield to another location·View the Illinois environmental rules overview