Springfield, IL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
4,000 sq ft disturbance or 200 cu yd excavation/fill
Permit fee (1 acre or less)
$100
Fee, 1-5 acres
$80 per acre
Review timeline (under 1 acre)
2 weeks initial, 1 week resubmittal
Inspection frequency
Weekly and after 0.5" rain events
Penalty
$25-$500 per violation, per day
Enforcing agency
Office of Public Works, Dept. of Building and Zoning

Summary

Springfield requires an erosion control permit before any construction, land disturbance over 4,000 square feet, or excavation/fill of 200 cubic yards or more. The Office of Public Works, Department of Building and Zoning issues permits after review of a required erosion control plan.

(a)This chapter applies to the following types of land development or land disturbance activities. The following activities require an erosion control permit:(1)Building or construction on any land area.(2)Any land disturbing activity affecting a surface of 4,000 square feet or more.(3)Excavation and/or filling 200 cubic yards or more of ground, sand, or other excavation or fill material...(7)Disturbing any size land area on slopes greater than 12 percent grade.

Source: Springfield, IL Code of OrdinancesView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 82).

Full Breakdown

City Code Chapter 154 requires an erosion control permit for building or construction on any land area, land disturbance affecting 4,000 square feet or more, excavation or filling of 200 cubic yards or more, work on slopes greater than 12 percent grade, and underground utility work extending 300 feet or more, among other listed activities (Sec. 06(a)). Agricultural use, gardening, ordinary landscaping, tree harvesting, and disturbances below those thresholds are exempt (Sec. 06(b)). For sites under one acre, the applicant submits a permit application and erosion control plan to the Office of Public Works, Department of Building and Zoning, which must issue or deny the permit within two weeks, with one-week review cycles for resubmittals (Sec.

07(a)). Sites of one acre or more route through the city engineer and must include the Illinois EPA Notice of Intent and Storm Water Pollution Prevention Plan, with a two-week review cycle (Sec. 07(b)). Permit fees run $100 for one acre or less, $80 per acre from one to five acres, and $20 per acre thereafter, with no transfer fee (Sec. 08). 5 inches or more in 24 hours, and repair damaged controls immediately (Sec. 11). Soil left inactive more than 14 calendar days must be stabilized by mulching, seeding, sodding, or covering, and storage piles over ten cubic yards must sit at least 25 feet from a roadway ditch or drainage channel if left 14 or more days (Sec. 15(c)(9)-(10)).

Violations & Fines

The Office of Public Works, Department of Building and Zoning issues a notice of violation stating the required corrective action and deadline; missed deadlines can trigger a stop work order covering all site work except the correction (Sec. 154.25). Uncorrected or urgent violations let the city perform the corrective work itself and bill the permittee for actual and administrative costs (Sec. 154.25(c)). The Office of Corporation Counsel can pursue administrative adjudication under Chapter 39 or a circuit court injunction, and certificates of occupancy and building permits are withheld while a violation, court order, or unpaid fine remains outstanding (Sec. 154.26). Fines run $25 to $500 per violation, with each day of continued violation a separate offense (Sec. 154.999).

Frequently Asked Questions

When does Springfield require an erosion control permit?
A permit is required for any building or construction, land disturbance of 4,000 square feet or more, excavation or fill of 200 cubic yards or more, disturbance on slopes over 12 percent grade, or underground utility work of 300 feet or more, per Sec. 154.06(a). Agricultural use, gardening, and smaller disturbances are exempt under Sec. 154.06(b).
How much does an erosion control permit cost in Springfield?
Sec. 154.08 sets the fee at $100 for sites of one acre or less, $80 per acre for one to five acres, and $20 per acre for each acre beyond that. The city council can adjust these fees, and no fee applies to a permit transfer.
How often must erosion controls be inspected?
Sec. 154.21(a) requires the permittee's qualified inspector to check constructed erosion and sediment control measures at least once weekly and after every rain event of 0.5 inches or more within 24 hours, with a written inspection record kept on site.
What happens if erosion control requirements aren't met?
The city issues a notice of violation specifying the correction needed and a deadline; missing it can bring a stop work order. Fines run $25 to $500 per violation under Sec. 154.999, and certificates of occupancy or building permits are withheld until compliance under Sec. 154.26.

Sources & Official References

Other rules in Springfield

All Springfield rules

Compare Springfield to another location·View the Illinois environmental rules overview

Get notified when Erosion Control in Springfield, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.