Tinley Park, IL Environmental Rules: Stormwater Management (2026)
Key Facts
- Design requirement
- control peak storm water discharge
- Industrial sites
- must file NPDES notice of intent
- Sizing standard
- MWRDGC peak-flow calculations
- Waiver available
- 5 listed conditions, § 151.08
- Max fine
- $500 per day, § 151.10(E)
Summary
Village Code § 151.05 requires every development site in Tinley Park to control peak storm water discharge and reduce runoff generation, using pervious areas and infiltration wherever practical. Industrial sites must file a federal NPDES notice of intent and carry out a storm water pollution prevention plan, and applicants must consult the village on additional design requirements before design begins.
Unless judged by the village to be exempt or granted a waiver, the following performance criteria shall be addressed for storm water management at all sites: (A) All site designs shall, to the maximum extent possible, establish storm water management practices to control the peak flow rates of storm water discharge associated with specified design storms and reduce the generation of storm water runoff. These practices should seek to utilize pervious areas for storm water treatment and to infiltrate storm water runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical. ... (C) Certain industrial sites are required to prepare and implement a storm water pollution prevention plan, and shall file a notice of intent (NOI) under the provisions of the National Pollutant Discharge Elimination System (NPDES) general permit.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-40: Supplement contains: Local legislation current through Ordinance 2026-O-007, passed 2-17-2026, Resolution 2018-R-077, passed 10-2-18, and State legislation current through 2010 Pamphlet No. 7).
Full Breakdown
05 sets the village's general performance criteria for storm water management, which apply at every site unless the village judges the site exempt or grants a waiver. Site designs must, to the maximum extent possible, establish practices controlling the peak flow rate of storm water associated with specified design storms and reducing runoff generation, using pervious areas for treatment and infiltrating runoff from driveways, sidewalks, rooftops, parking lots and landscaped areas wherever practical. Stream channels must be protected from degradation using the channel protection criterion in the Illinois Urban Manual, and peak-flow calculations required by the Metropolitan Water Reclamation District of Greater Chicago govern the sizing of storm water practices.
Industrial sites required to prepare a storm water pollution prevention plan must also file a notice of intent under the National Pollutant Discharge Elimination System general permit, a requirement that applies to both existing and new industrial sites. 06 adds specific design criteria: detention basins must capture runoff pollutants, with preference given to wet-bottom and wetland designs near existing wetlands, and dry basins with low-flow bypasses may be used where suitable, promoting retention and infiltration to cut runoff volume and pollutant load. 07 requires post-construction compliance with NPDES permit ILR10 and long-term operation and maintenance of best management practices. 08 only if the applicant shows one of five conditions, such as an approved alternative plan or an equally protective off-site facility.
Violations & Fines
Storm water management is enforced through the same Chapter 151 penalty structure that governs erosion control: § 151.10(E) makes a violation a misdemeanor punishable by a fine of up to $500 per day, with each day of noncompliance a separate offense, plus the cost of any required site restoration. The Director of Public Works can also revoke a site development permit for violating its storm water conditions.
Frequently Asked Questions
What storm water controls does Tinley Park require on a development site?
Do industrial sites have extra storm water obligations?
Can Tinley Park waive its storm water management requirements?
Sources & Official References
Other rules in Tinley Park
Compare Tinley Park to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Stormwater Management in Nearby Cities
How other cities in Cook County handle stormwater management.