Tinley Park, IL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
excavation/fill over 25 cubic yards
Permit trigger
disturbance over 500 sq ft
Reviewing officials
Village Engineer, Director of Public Works
Max fine
$500 per day, § 151.10(E)
Permit expiration
180 days to start, 1 year to finish
Appeal body
Public Works and Boundaries Committee

Summary

Village Code § 151.04 requires a site development permit before land in Tinley Park is cleared, graded, filled or otherwise disturbed once the work crosses set thresholds, such as more than 25 cubic yards of cut or fill or disturbance over 500 square feet. Violators face a misdemeanor fine of up to $500 per day under § 151.10(E).

Before land is cleared, graded, filled, transported, or otherwise disturbed by the movement of earth for purposes including, but not limited to, the construction of buildings, the mining of minerals, including sand and gravel, the development of golf courses, the filling of land and the construction of roads and streets by any person, partnership, or corporation within the village, a site development permit embodying the proposed earth movement shall be obtained from the village where development comes under any one or more of the following provisions, unless such development is exempted therefrom by division (A)(2) of this section: (a) Excavation, fill, or any combination thereof, will exceed 25 cubic yards. (b) Fill will exceed one foot in vertical depth at its deepest point measured from the natural ground surface. (c) Excavation will exceed one foot in vertical depth at its deepest point. (d) Excavation, fill, or any combination thereof will exceed an area of 500 square feet.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-40: Supplement contains: Local legislation current through Ordinance 2026-O-007, passed 2-17-2026, Resolution 2018-R-077, passed 10-2-18, and State legislation current through 2010 Pamphlet No. 7).

Full Breakdown

04(A)(1) requires anyone clearing, grading, filling, transporting or otherwise disturbing earth in Tinley Park, whether for building construction, mineral mining, golf course development, land filling or road and street construction, to obtain a site development permit once the work meets any one of five numeric thresholds: excavation or fill exceeding 25 cubic yards; fill exceeding one foot of vertical depth at its deepest point; excavation exceeding one foot of vertical depth; excavation or fill covering more than 500 square feet; or plant-cover removal from more than 500 square feet of a vacant parcel or a parcel over one acre.

04(A)(2) exempts specific work, including excavation for septic systems, tanks, pools or footings already covered by a building permit, public utility installation in easements, tilling for fire protection, site disturbance under one acre in the aggregate, emergency work, existing farm and nursery operations, and certain farm conservation structures on agricultural land. 04(B). 09(C) when the grading threatens property or a drainage structure.

Violations & Fines

Section 151.10(E) makes it a misdemeanor to grade, excavate, fill or alter land in violation of Chapter 151, with each day of a continuing violation treated as a separate offense punishable by a fine of up to $500 per day. A violator convicted under this section must also pay the cost of restoring the site, and the Director of Public Works may revoke or suspend a site development permit under § 151.10(B) for violating its terms.

Frequently Asked Questions

When do I need a site development permit for grading in Tinley Park?
Section 151.04(A)(1) requires a permit once work crosses any listed threshold: more than 25 cubic yards of cut or fill, fill or excavation deeper than one foot, disturbance over 500 square feet, or plant-cover removal from more than 500 square feet of a vacant or over-one-acre parcel.
Are any projects exempt from Tinley Park's erosion control permit?
Yes. Section 151.04(A)(2) exempts excavation already covered by a building permit, such as for septic systems or pool footings, utility work in easements, fire-protection tilling, disturbance under one acre in the aggregate, emergency work, existing agricultural operations, and certain farm conservation structures.
What is the penalty for grading without a permit in Tinley Park?
Section 151.10(E) treats it as a misdemeanor punishable by a fine of up to $500 for each day the violation continues, and the violator must also bear the cost of restoring the site to its prior condition.

Sources & Official References

Other rules in Tinley Park

All Tinley Park rules

Compare Tinley Park to another location·View the Illinois environmental rules overview

Get notified when Erosion Control in Tinley Park, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Cook County handle erosion control.

Skokie, IL
Some Restrictions
Oak Lawn, IL
Some Restrictions
Chicago, IL
Some Restrictions
Evanston, IL
Some Restrictions
Arlington Heights, IL
Some Restrictions
Schaumburg, IL
Some Restrictions