Bloomington, IL Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard defined
- Base flood elevation plus one foot
- Governing code
- Bloomington City Code §§ 18-201, 18-701
- Lowest floor rule
- At or above flood protection elevation
- Vent sizing
- 1 sq in per sq ft enclosed area
- Variance body
- Board of Zoning Appeals
Summary
In the City of Bloomington, any building protected from flood damage in the floodplain must have its lowest floor, including the basement, at or above the flood protection elevation, which the code defines as the base flood elevation plus one foot of freeboard.
FLOOD PROTECTION ELEVATION or FPE The elevation of the base flood plus one foot of freeboard at any given location in the floodplain. ... The lowest floor (including basement) ... shall be at or above the flood protection elevation;
Full Breakdown
Bloomington City Code § 18-201 defines 'flood protection elevation' or FPE as the elevation of the base flood plus one foot of freeboard at any given location in the floodplain, and the base flood itself is the flood with a 1% chance of being equaled or exceeded in any year, commonly called the one-hundred-year flood. Section 18-301 ties the base flood elevation to the McLean County Flood Insurance Study dated July 16, 2008 for Sugar Creek, Little Kickapoo Creek, Skunk Creek and Goose Creek, to the Flood Insurance Rate Map for AH and AO zones, and to the best available federal, state, or other data for remaining A-zone floodplains, requiring a financed engineering study if no data exists.
Under § 18-701, any new building valued over $1,000, any substantially improved building, any structure enlarged more than 20% in floor area, and any manufactured home or long-term travel trailer placed in the floodplain must be protected below the flood protection elevation. Owners can meet this either by building on permanent fill with the lowest floor at or above the FPE, or by elevating the structure on stilts, piles, or walls with the lowest floor and all mechanical, electrical, and utility equipment at or above the FPE, with enclosed areas below that line limited to parking or access and fitted with flood-vent openings sized at one square inch per square foot of enclosed area.
Manufactured homes and long-term travel trailers must be elevated to or above the FPE and tied down under the state Mobile Home Tie-Down Act rules.
Violations & Fines
Building below the flood protection elevation without qualifying for a variance violates Bloomington City Code § 18-701, enforced through the City's development permit process under Chapter 18. A variance from the freeboard requirement requires Board of Zoning Appeals review and written acknowledgment that the reduced elevation raises flood insurance premiums by as much as $25 per $100 of coverage and increases risk to life and property.
Frequently Asked Questions
What is 'flood protection elevation' in Bloomington?
How high must my house's lowest floor be if I'm building in a Bloomington floodplain?
Can I get a variance from the freeboard requirement?
Sources & Official References
Other rules in Bloomington
Compare Bloomington to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.