Bloomington, IL Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Bloomington, IL, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Governing code
- Bloomington City Code § 18-501
- Permit issued by
- City Engineering Department
- Flood map used
- FEMA FIRM dated July 16, 2008
- Covered creeks
- Sugar, Little Kickapoo, Skunk, Goose Creek
- Exemption
- Land surveyed above base flood elevation
Summary
In the City of Bloomington, no one may build, fill, grade, or otherwise develop land inside a mapped floodplain without first getting a development permit from the Engineering Department, which will not issue one unless the project meets the City's floodplain damage-prevention and building-protection standards.
No person, firm, corporation, or governmental body not exempted by state law shall commence any development in the floodplain without first obtaining a development permit from the Engineering Department of City of Bloomington. The Director shall not issue a development permit if the proposed development does not meet the requirements of this ordinance.
Full Breakdown
Bloomington City Code Chapter 18, the Floodplain Area Development Code, applies to land within the special flood hazard areas shown on the McLean County Flood Insurance Rate Map dated July 16, 2008, including areas along Sugar Creek, Little Kickapoo Creek, Skunk Creek and Goose Creek, plus floodplains in unincorporated McLean County within the City's extraterritorial jurisdiction. Under § 18-501, no person, firm, corporation, or governmental body not exempted by state law may commence 'development,' defined broadly to include construction, filling, grading, excavating, paving, drilling, mining, dredging, or installing utilities, roads, levees, dams, or storage tanks, without first obtaining a development permit from the City's Engineering Department.
The Director of Engineering compares the site's elevation to the base flood elevation before issuing a permit, and applications must include scale drawings, existing and proposed grade elevations, building locations and dimensions, and the proposed lowest-floor elevation. The Director will not issue a permit unless the proposal meets the damage-prevention standards of Article VI, which generally bar development that would increase flood heights or velocities, and the building-protection standards of Article VII. Land shown by survey to have already been above the base flood elevation as of the site's first Flood Insurance Rate Map date is not treated as floodplain and falls outside the permit requirement. Anyone who disagrees with the mapped data may finance a detailed engineering study and submit it to FEMA for approval of better data.
Violations & Fines
Developing in the floodplain without the Engineering Department's permit, or against its terms, violates Bloomington City Code Chapter 18. The Director enforces the permit requirement and the damage-prevention and building-protection standards of Articles VI and VII, and unpermitted or noncompliant development can be ordered corrected under the ordinance's general administration provisions before the City will sign off on the project.
Frequently Asked Questions
Do I need a permit to build in a Bloomington floodplain?
What counts as 'development' under Bloomington's floodplain code?
Which Bloomington waterways are covered by the floodplain ordinance?
Sources & Official References
Other rules in Bloomington
Compare Bloomington to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.