Vanderburgh County, IN Environmental Rules: Stormwater Management (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing chapter
Vanderburgh County Code Ch. 13.04
Trigger threshold
Over 10,000 sq ft new impervious surface
Review body
Vanderburgh County Drainage Board
Plan intake
County Surveyor, Room 325 Civic Center
Submission deadline
2 full weeks before Board meeting
Peak release cap
25-yr post vs. 10-yr pre-development rate

Summary

Any new development, redevelopment or land-disturbing activity in unincorporated Vanderburgh County that adds more than 10,000 square feet of impervious surface must submit an engineered drainage plan to the County Drainage Board through the County Surveyor's office before construction.

City-specific rules exist: Evansville has its own stormwater management rules that differ from Vanderburgh County's county-level regulations. If you live in Evansville, check the city-specific page instead.

A. Drainage Plan Required. It is the policy of the board of county commissioners of Vanderburgh County, Indiana, hereinafter referred to as the commissioners, that an engineered drainage plan be submitted to the Vanderburgh County drainage board, hereinafter referred to as the drainage board, for any new development, redevelopment, new construction, addition to existing construction, or other land disturbing activity located within the commissioners' and/or the drainage board's jurisdiction which shall result in the addition of impervious surfaces exceeding a total of ten thousand (10,000) square feet.

Full Breakdown

5, which require that a drainage plan preserve the amount of drainage that existed when the tract was created and not change where surface water enters or exits the tract, subject to the County Drainage Board's authority to approve an alternate plan. , Evansville, no later than two full weeks before the Drainage Board meeting where it will be presented. The Drainage Board can also aggregate a series of smaller activities within a 3-year window into one project if their combined impervious addition exceeds the 10,000-square-foot threshold.

S. 41 Industrial Corridor, unless direct discharge into a major waterway such as Pigeon Creek or the Ohio River is approved. 020 caps the post-development controlled peak release rate during a 25-year storm at or below the pre-development peak release rate during a 10-year storm from the same land.

Violations & Fines

Chapter 13.04 authorizes the County Surveyor to route and review every submitted drainage plan and gives the Drainage Board final say on whether a plan or an alternate plan satisfies the chapter, including designating impacted drainage areas that trigger tighter release-rate limits, such as the 100-year-to-10-year peak ratio applied in the North U.S. 41 Industrial Corridor and the eastside impacted drainage area. Projects with final drainage plan approval predating the relevant impacted-area declaration, and subdivisions already recorded before the governing ordinance, are exempted from the stricter release-rate standard for that area, but any project whose primary plat and development plans lapse unimplemented with the Area Plan Commission must resubmit and is treated as a new project subject to current requirements.

Frequently Asked Questions

When does a Vanderburgh County drainage plan become mandatory?
Section 13.04.010 requires an engineered drainage plan whenever a new development, redevelopment, new construction, addition, or other land-disturbing activity in the Commissioners' or Drainage Board's jurisdiction adds more than 10,000 square feet of impervious surface, or when a series of smaller activities within 3 years cumulatively crosses that threshold.
Where do I file a Vanderburgh County stormwater drainage plan?
The plan goes to the Vanderburgh County Surveyor's office, Room 325, Civic Center Complex, 1 Martin Luther King Blvd., Evansville, submitted in triplicate no later than two full weeks before the Drainage Board meeting at which it will be presented, per Section 13.04.010(C).
What stormwater release rate must a Vanderburgh County project meet?
Under Section 13.04.020, a project required to store excess runoff must control its post-development peak release rate during a 25-year return-period storm so it does not exceed the peak release rate the same land produced during a 10-year storm before development.
Are any Vanderburgh County projects exempt from stormwater storage requirements?
Yes. Section 13.04.015 exempts direct discharges into major waterways like Pigeon Creek or the Ohio River where controlled release is waived, and separately exempts projects with final drainage plan approval or subdivisions recorded before the relevant impacted-area declaration took effect.

Sources & Official References

Other rules in Vanderburgh County

All Vanderburgh County rules

Compare Vanderburgh County to another location·View the Indiana environmental rules overview

Get notified when Stormwater Management in Vanderburgh County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Cities Across Vanderburgh County