Marion County, FL Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Approval authority
Office of the County Engineer
Required at
Building permit application
Applies to
New structures and additions
Construction runoff
Must stay on site or be routed

Summary

New structures and additions need an individual stormwater drainage plan approved by the County Engineer before a building permit issues.

These county ordinances apply to unincorporated areas of Marion County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Individual stormwater drainage plan. At the time of permit application, an individual stormwater drainage plan must be submitted for all new structures or additions to existing structures. The individual stormwater drainage plan must show compliance with either the master drainage plan for the entire development, or when no master stormwater drainage plan is on file, accepted stormwater design criteria as detailed in the Marion County Land Development Code, and approved by the Office of the County Engineer.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 122 | Land Development Code: Supplement 7).

Full Breakdown

Marion County requires an individual stormwater drainage plan at the time of permit application for any new structure or addition. The plan must match the master drainage plan for the development, or, where none exists, the Land Development Code's stormwater design criteria, and gets sign-off from the Office of the County Engineer. It must show where runoff not absorbed on site will go: an approved retention area or existing drainage ditch. During construction, any increase in runoff has to stay on site or be routed through swales, ditches, or piping to approved drainage areas, with erosion controls preventing uncontrolled discharge.

Violations & Fines

Building official can withhold the permit or certificate of occupancy until the drainage plan is submitted and approved by the County Engineer.

Frequently Asked Questions

Do I need a drainage plan for a small addition?
Yes. Sec. 5.5-33(m) applies to new structures or additions to existing structures, with no size exemption stated.
What if there's no master drainage plan for my subdivision?
Your individual plan must instead meet the stormwater design criteria in the Marion County Land Development Code, per Sec. 5.5-33(m).

Sources & Official References

Other rules in Marion County

All Marion County rules

Florida rules heatmap·Compare Marion County to another location·View the Florida environmental rules overview

Get notified when Stormwater Management in Marion County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.