Key Facts

Fee, IBC-reviewed wall (commercial/multi-family)
5.13% of construction cost
Fee, IRC-reviewed wall (single-family detached)
3.00% of construction cost
Base permit fee minimum
$135.00
Plan review filing fee, single-family
50% of permit fee
Permit expires if work not started
within 6 months
Appeal deadline, new construction
90 calendar days

Summary

Fairfax County regulates retaining wall construction as a permitted building activity under Chapter 61, not as a zoning setback issue. Appendix Q, Section I.B(L) sets the permit fee as a percentage of estimated construction cost: 5.13% for walls reviewed under the International Building Code (commercial or multi-family) and 3.00% for walls reviewed under the International Residential Code (single-family detached).

These county ordinances apply to unincorporated areas of Fairfax County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(L)Retaining Walls: The fee for installation and repair of a retaining wall: • Retaining walls reviewed/inspected under the International Building Code (generally commercial or multi-family) Percentage of the estimated cost of construction 5.13% • Retaining walls reviewed/inspected under the International Residential Code (generally single-family detached dwellings) (The permittee must provide verifiable detail of the cost of construction.) Percentage of the estimated cost of construction. 3.00%

Full Breakdown

00% when reviewed under the International Residential Code, typically single-family detached lots. The permittee must supply verifiable cost-of-construction detail to calculate the fee; a base fee of $135 applies to permits that would otherwise fall below that minimum under Section 61-1-3(d)(1). G. Section 61-1-4(d) requires that where required by law or where the Building Official determines it necessary, construction documents for the permit application, including retaining wall plans, be prepared, signed and sealed by a registered design professional licensed in Virginia. Once issued, a retaining wall permit becomes invalid under Section 61-1-4(c) if work is not commenced within six months, or if work on site is suspended or abandoned for six months; the burden of proving the work was not abandoned falls on the permit holder, and the Building Official may grant extensions of up to one year each on written request.

Violations & Fines

Retaining wall construction without the required Chapter 61 building permit, or work that lapses under an invalid permit, is enforced by the Building Official within the Department of Land Development Services, who can require the applicant to reapply and pay fees again under Section 61-1-3. A Building Official decision on a retaining wall permit, including a refusal to approve plans or a determination that sealed engineering documents are required, may be appealed under Section 61-2-2 to the Fairfax County Board of Building and Fire Prevention Code Appeals within 90 calendar days of the decision for new construction.

Frequently Asked Questions

Do I need a permit to build a retaining wall in Fairfax County?
Yes. Retaining wall installation and repair is a permitted building activity under Chapter 61 of the county code and Appendix Q, Section I.B(L). The fee is charged as a percentage of the estimated cost of construction, not a flat amount, so the permittee must document that cost to the Building Official.
How much does a Fairfax County retaining wall permit cost?
It depends on which code reviews the wall. Walls reviewed under the International Building Code, generally commercial or multi-family projects, are charged 5.13% of estimated construction cost. Walls reviewed under the International Residential Code, generally single-family detached lots, are charged 3.00%, subject to the $135 base fee minimum.
Does a Fairfax County retaining wall need engineered, sealed plans?
Where required by law or where the Building Official determines it is necessary, Section 61-1-4(d) requires that construction documents, including retaining wall plans, be prepared, signed and sealed by a design professional registered in Virginia before the permit is issued.
What happens if I don't finish my retaining wall permit within six months?
Under Section 61-1-4(c), the permit becomes invalid if authorized work is not commenced within six months of issuance, or is suspended or abandoned on site for six months. The permit holder bears the burden of proving the work was not abandoned, though the Building Official can grant extensions up to a year at a time.

Sources & Official References

Other rules in Fairfax County

All Fairfax County rules

Compare Fairfax County to another location·View the Virginia fence regulations overview

Get notified when Retaining Walls in Fairfax County, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Retaining Walls in Cities Across Fairfax County