Santa Barbara County, CA Fire Regulations: Propane Storage (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Zoning permit needed
No, exempt under Sec. 35.20.040.B.18
Fire permit needed
Yes, under adopted CFC 105.5.30
Fire permit fee
$99.00 per Sec. 15-101 fee schedule
Fire code edition adopted
2025 California Fire Code
Zoning exemption covers
Residential and agricultural zones only

Summary

A residential or agricultural propane tank does not need a zoning permit under Development Code Sec. 35.20.040.B.18, but installing or operating one still requires a Fire Department operational permit because Sec. 15-3 adopts California Fire Code Sec. 105.5.30 (LP-gas) in full, with a $99 fee under the county's fee schedule.

These county ordinances apply to unincorporated areas of Santa Barbara County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

SECTION 105 PERMITS is amended by adopting and amending the following: ... 105.5.30 LP-gas is adopted in its entirety [Sec. 15-3]. Fee schedule: 105.5.30 LP-gas $99.00 [Sec. 15-101]. Development Code exemption: 18.Propane tanks. Propane tanks located in residential or agricultural zones. [Sec. 35.20.040.B.18]

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 44 Update 1).

Full Breakdown

Two separate county rules cover propane. 18 lists 'Propane tanks located in residential or agricultural zones' among the activities exempt from all planning permit requirements of the Development Code, so a homeowner or farm placing a propane tank does not need a Land Use Permit, Zoning Clearance, or other planning approval, as long as it still meets setback, height, and other applicable development standards. 30 LP-gas is adopted in its entirety,' meaning the county did not modify the state model code's LP-gas operational permit trigger; it applies exactly as the Fire Code writes it.

30 LP-gas' line item, the same flat rate charged for several other single-category operational permits such as floor finishing and hot work operations. 30, such as bulk or cylinder storage above the code's exempt thresholds, still needs the Fire Department's operational permit and must pay the $99 fee before the county will sign off, and the Fire Department retains inspection authority over the installation regardless of the zoning exemption.

Violations & Fines

Operating an LP-gas installation that requires a Fire Code 105.5.30 permit without first obtaining and paying for it is a violation of Section 15-3's adopted Fire Code provisions, enforceable by the Fire Department the same as any other unpermitted operational fire-code activity under Chapter 15, up to and including a stop-work or stop-use order until the $99 permit is obtained and the installation is inspected. The Section 35.20.040.B.18 zoning exemption does not excuse this fire-permit requirement; it only means Planning and Development will not separately cite the tank for lacking a land use permit as long as the exempt-use conditions in Section 35.20.040.A, including compliance with setbacks and height limits, are met.

Frequently Asked Questions

Do I need a county zoning permit to install a propane tank at my house in unincorporated Santa Barbara County?
No. Section 35.20.040.B.18 exempts propane tanks located in residential or agricultural zones from all planning permit requirements, as long as the installation still meets setback, height, and other applicable Development Code standards.
Does the zoning exemption mean I skip the fire permit too?
No. Section 15-3 separately adopts California Fire Code Section 105.5.30 for LP-gas in its entirety, so an operational permit from the Fire Department, priced at $99 under the Section 15-101 fee schedule, is still required regardless of the zoning exemption.
How much does the county charge for the LP-gas fire permit?
The Section 15-101 fee schedule lists a flat $99.00 fee for the '105.5.30 LP-gas' operational permit, the same rate charged for several other single-category Fire Code operational permits such as floor finishing.

Sources & Official References

Other rules in Santa Barbara County

All Santa Barbara County rules

California rules heatmap·Compare Santa Barbara County to another location·View the California fire regulations overview

Get notified when Propane Storage in Santa Barbara County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Propane Storage in Cities Across Santa Barbara County