Skip to main content
CityRuleLookup

Madison County, IL Home Business: Home Daycare (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Zoning status
Special use, § 93.025(G)(3), R-1 through R-4
Indoor space
50 sq ft per child, § 93.088(A)
Outdoor play area
100 sq ft fenced, per child, § 93.088(B)
Approval
Zoning Board of Appeals hearing + County Board vote
Penalty
$10-$500 per day, § 93.999

Summary

In unincorporated Madison County's R-1 through R-4 districts, 'day care or nursery schools' are a special use under § 93.025(G)(3), not a by-right home business, and must meet the space standards in § 93.088: 50 square feet of indoor floor space and 100 square feet of outdoor play area per child.

These county ordinances apply to unincorporated areas of Madison County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(G) Special uses. (See §§ 93.162 and 93.178 ). ... (3) Day care or nursery schools. ... In any district where nursery schools are permitted, the following requirements shall be met: (A) For each child at east 50 square feet of floor space shall be provided in addition to that provided for sleeping purposes. (B) For each child at least 100 square feet of outdoor, enclosed (fenced) play area shall be provided.

Full Breakdown

Madison County doesn't treat a home day care as an ordinary home occupation. 178, the same route required for cemeteries, hospitals and mobile homes in those districts. ' Those two numbers set the practical capacity of any home-based operation: a small in-home program has to have both the indoor square footage per child and a fenced outdoor play area sized to match its enrollment. The special-use route also means neighbors get notice and a public hearing before a home day care opens, and the County Board can deny the application or, if owners of 20% of the adjoining frontage file a written protest, require a three-fourths vote to approve it.

The rule covers unincorporated county land only; a home day care inside Edwardsville, Alton, Collinsville, Granite City or another municipality is governed by that city's own zoning code instead.

Violations & Fines

Running a day care or nursery school in an R-1 through R-4 district without the required special use permit, or without meeting the 50-square-foot indoor and 100-square-foot fenced outdoor play area standards of § 93.088, violates the zoning code and is punishable under § 93.999 by a $10 to $500 fine per day of continued violation, plus possible Circuit Court enforcement.

Frequently Asked Questions

Can I run a home day care in unincorporated Madison County?
Only with a special use permit. Section 93.025(G)(3) lists 'Day care or nursery schools' as a special use in the R-1 through R-4 districts, so you need Zoning Board of Appeals review and County Board approval under §§ 93.162 and 93.178 before opening.
How much space does the code require per child?
Section 93.088 requires 50 square feet of indoor floor space per child, beyond any area used for sleeping, plus 100 square feet of outdoor, enclosed and fenced play area per child, for any nursery school or day care permitted in the district.
What if I just want to babysit a couple of neighborhood kids?
The code doesn't set a numeric child-count threshold separating an informal arrangement from a regulated 'day care or nursery school,' so anyone running a business under that label in an R-1 through R-4 district should assume the special-use permit and § 93.088 space standards apply.

Sources & Official References

Other rules in Madison County

All Madison County rules

Compare Madison County to another location·View the Illinois home business overview

Get notified when Home Daycare in Madison County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.