St. Tammany Parish, LA Hurricane Preparedness: Flood Elevation (2026)
Key Facts
- Zone X/D minimum
- 12 inches above street centerline or curb
- Zone A/AE/AH minimum
- Base flood elevation plus 12 inches
- Zone V/VE measurement
- Lowest horizontal member, BFE plus 12 in
- Max fill on narrow lots
- 24 inches; more needs piers, posts, or piles
- Enforcing office
- Permitting Department / Floodplain Administrator
- CO occupancy fine
- $100.00 per day (Sec. 300-8.A)
- Datum
- NAVD88 vertical datum
Summary
St. Tammany Parish sets minimum floor elevations by FEMA flood zone under UDC Sec. 300-5.3.I. Homes in Zone X or D must sit at least 12 inches above the street centerline or curb, while structures in numbered A, AE, AH, V, or VE zones must clear the base flood elevation plus 12 inches. The Permitting Department enforces the standard through elevation certificates at three separate construction stages.
Minimum Flood Elevation Requirement.1.Minimum Elevation Requirement. Minimum flood elevation requirement for residential and commercial structures by zone are:a.Zone "X" or "D". Elevations of the lowest habitable floor in an "X" or "D" zone shall be not less than 12 inches above the centerline of street or top of curb fronting the structure, whichever is greater.b.Zones unnumbered "A" or "AO". Elevations of the lowest habitable floor in an unnumbered "A" and "AO" zone shall be not less than the base flood elevation, as determined by the Parish Flood Plain Administrator, plus 12 inches.c.Zones numbered "A," "AE," or "AH". Elevations of the lowest habitable floor in numbered "A," "AE," and "AH" zone shall be not less than the base flood elevation, as determined by the Flood Insurance Study, plus 12 inches.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 12 Update 2).
Full Breakdown
The parish's Unified Development Code ties minimum floor height to the FEMA flood zone printed on the property's panel. In an unnumbered "X" or "D" zone, the lowest habitable floor must sit at least 12 inches above the centerline of the street or the top of curb fronting the lot, whichever reading is higher. In an unnumbered "A" or "AO" zone the floor must clear the base flood elevation set by the Parish Flood Plain Administrator by 12 inches, and in a numbered "A," "AE," or "AH" zone it must clear the base flood elevation from the Flood Insurance Study by the same 12 inches. Coastal "V" and "VE" zones are measured differently: the bottom of the lowest horizontal structural member, not the floor, must clear the base flood elevation by 12 inches. Commercial buildings that choose dry floodproofing instead of elevating must add a full additional foot on top of whichever zone standard applies.
Fill has its own ceiling. On a residential lot narrower than 90 feet in an A, AE, AO, AH, X, or D zone, a builder may raise the pad with fill up to 24 inches; anything higher requires piers, posts, piles, or a stem wall instead. Fill is barred outright for elevating a structure in a V, VE, or VO zone. Elevations are referenced to the NAVD88 vertical datum.
Compliance is checked three separate times under Sec. 300-5.4: a "construction drawing" elevation certificate before the Permitting Department issues the building permit, a "Building Under Construction" certificate after the foundation forms are set but before the pour (or before framing on an elevated home), and a "Finished Construction" certificate after the structure is complete but before a certificate of occupancy is issued. The Director of the Permitting Department can approve a lower elevation where existing topography makes matching the street grade impractical or would harm neighboring drainage, or approve fill above 24 inches where a subdivision has an approved fill plan.
Violations & Fines
Building without the required elevation certificates blocks every later inspection: the Permitting Department will not schedule the foundation, framing, or final inspection, and a certificate of occupancy cannot issue under Sec. 300-5.4. Occupying a structure before a certificate of occupancy is granted draws a $100.00-per-day fine under Sec. 300-8.A until the contractor of record complies, with stop-work orders issued on all active permits in the meantime.
Frequently Asked Questions
What is the minimum flood elevation for a home in an X or D zone in St. Tammany Parish?
Can I use fill to raise a house instead of building on piers?
When do I need an elevation certificate?
Sources & Official References
Other rules in St. Tammany Parish
Compare St. Tammany Parish to another location·View the Louisiana hurricane preparedness overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.