Skip to main content
CityRuleLookup

Charles County, MD Landscaping Rules: Native Plants (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Buffer minimum width
100 feet from mean high-water line
Banned in Buffer
New lawn or turf installation
Required planting
Native species, distributed throughout the Buffer
Max civil penalty
$10,000 per offense, per day
Restoration ratio
3x disturbed area, 4x if inside Buffer
Bond required
Over $1,000 or 1,000 sq ft, held 2 years
Governing section
Charles County Code § 297-131D

Summary

Any development disturbing Charles County's Critical Area Buffer, the vegetated strip protecting tidal shorelines and streams, must replant with native species under an approved Buffer Management Plan per § 297-131D. New lawn or turf is barred inside the Buffer, and plantings need mulch cover until established.

These county ordinances apply to unincorporated areas of Charles County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

D. Buffer mitigation and planting standards. ... (2) A Buffer Management Plan in accordance with Subsection E shall be sufficient to satisfy the planting and mitigation standards of this section as well as establishment requirements in Subsection B so as to: (a) Prohibit the installation or cultivation of new lawn or turf on site in the Buffer. (b) Ensure the planting of native species. (c) Ensure coverage of the Buffer with mulch or ground cover or both until Buffer plantings are established. (d) Ensure plantings are distributed throughout the Buffer to provide optimum habitat and water quality benefits.

Full Breakdown

The Critical Area Buffer is defined in § 297-128 as a naturally vegetated area protecting aquatic, wetland, and terrestrial environments from disturbance; along tidal waters, tributary streams, and tidal wetlands it runs at least 100 feet landward from the mean high-water line, and can be required wider where sensitive features are present. Section 297-131D, "Buffer mitigation and planting standards," applies whenever development or redevelopment activity happens inside that Buffer on a lot or parcel that includes one. Under § 297-131D(2), a Buffer Management Plan approved by the Planning Division must accomplish four things: prohibit installing or cultivating new lawn or turf anywhere in the Buffer; ensure the planting of native species; cover the Buffer with mulch or other ground cover until the new plantings are established; and spread the plantings throughout the Buffer so they deliver habitat and water-quality benefits rather than being clustered in one spot.

The mitigation and establishment requirements tie back into § 297-131B and are calculated cumulatively based on the type and permanence of the disturbance. Charles County backs this with its own violations chapter, § 297-135, rather than the chapter's general $300 penalty. A person who disturbs the Buffer without approval faces a civil penalty of up to $10,000 per offense, per day, on top of restoration duties: replanting native forest vegetation equal to three times the disturbed area, or four times if the disturbance was inside the Buffer itself, per § 297-132E. Restoration projects over 1,000 square feet or $1,000 in cost require a bond held for at least two years to confirm the plantings survive.

Violations & Fines

Disturbing the Critical Area Buffer without an approved Buffer Management Plan draws a civil penalty of up to $10,000 per offense per day under § 297-135A(1), on a sliding scale from $50 for a minor first offense up to $500 for major infractions. Restoration must replant native forest vegetation at three times the disturbed area, four times if inside the Buffer, and the County can require a bond held two years to confirm survival.

Frequently Asked Questions

Can I plant a regular lawn along my shoreline property in Charles County?
Not inside the Critical Area Buffer. Section 297-131D(2)(a) prohibits installing or cultivating new lawn or turf anywhere within the Buffer, which runs at least 100 feet landward of the mean high-water line along tidal waters, tributary streams, and tidal wetlands. Any planting there must instead use native species.
What has to be replanted after work disturbs the Buffer?
A Buffer Management Plan approved by the Planning Division must use native species, distributed throughout the disturbed area, with mulch or ground cover in place until the plantings establish, under § 297-131D(2). If the disturbance was a violation rather than approved work, native forest vegetation must be replanted at three to four times the disturbed area.
What's the penalty for disturbing the Critical Area Buffer without approval?
Up to $10,000 per offense, per day, under § 297-135A(1), on top of restoration costs. Charles County also uses a graduated schedule starting at $50 for a first minor infraction and rising to $500 for major infractions, and restoration projects over 1,000 square feet or $1,000 require a two-year survival bond.
Who reviews Buffer planting and restoration plans?
The Charles County Planning Division reviews and approves Buffer Management Plans under § 297-131D and § 297-131E, and it also reviews restoration and mitigation plans required after a violation, approving them before any replanting or restoration work is allowed to begin on site.

Sources & Official References

Other rules in Charles County

All Charles County rules

Compare Charles County to another location·View the Maryland landscaping rules overview

Get notified when Native Plants in Charles County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.