Merced County, CA Landscaping Rules: Rainwater Harvesting (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to
Projects creating/replacing 2,500-5,000 sq ft impervious surface
Rooftop disconnection target
Rain barrels, cisterns, or on-site permeable areas
Compliance options
1 of 7 listed site design measures
Documentation
SMARTS Post-Construction Calculator or accepted method
Larger projects
5,000+ sq ft face full LID standards instead
Administering agency
Department of Public Works

Summary

Small development projects in unincorporated Merced County that create or replace between 2,500 and 5,000 square feet of impervious surface, including qualifying single-family homes, must adopt at least one listed site design measure to cut runoff. Rerouting rooftop drainage to rain barrels, cisterns, or permeable areas is one of seven options under Section 9.53.030(A)(3)(a).

These county ordinances apply to unincorporated areas of Merced County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

a. Small Development Projects. Small development projects that create and/or replace (including projects with no net increase in impervious surface) between 2,500 square feet and 5,000 square feet of impervious surface, including detached single family homes that create and/or replace 2,500 square feet or more of impervious surface and are not part of a larger plan of development shall implement one or more of the following site design measures to reduce project site runoff: ... iv. Rooftop and Impervious Area Disconnection. Reroute rooftop drainage pipes to drain rainwater to rain barrels, cisterns, or on-site permeable areas instead of the storm drain system.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4930839; v8 updated 2026-06-02).

Full Breakdown

030(A)(3)(a) requires 'small development projects,' those that create or replace, including projects with no net increase in impervious surface, between 2,500 and 5,000 square feet of impervious surface, including detached single-family homes crossing the 2,500-square-foot threshold that are not part of a larger plan of development, to implement one or more of seven listed site design measures to reduce project runoff. Rooftop and Impervious Area Disconnection is listed as option (iv): rerouting rooftop drainage pipes to rain barrels, cisterns, or on-site permeable areas instead of the storm drain system.

The other six options are stream setbacks and buffers, soil quality improvement, tree planting and preservation, porous pavement or concrete, green roofs, and vegetated swales. A project proponent choosing rooftop disconnection, or any other measure, must quantify the resulting runoff reduction using the State Water Board's SMARTS Post-Construction Calculator or another methodology the county accepts. 030(B) rather than this small-project menu. The chapter does not require rain barrels on every house; it is one compliance path among several, and only for qualifying projects within the 2,500-to-5,000-square-foot band. The department of public works administers and reviews the chosen measures as part of civil plan review for the project.

Violations & Fines

A qualifying small development project that fails to implement any of the listed site design measures, including rooftop disconnection, will not receive plan approval, and the county can withhold building permit or occupancy sign-off until the runoff-reduction requirement is satisfied. Continued noncompliance after development is treated as a Chapter 9.53 violation, subject to a written notice, stop-work order, and misdemeanor penalties under Chapter 1.28.

Frequently Asked Questions

Does Merced County require rain barrels on every new house?
No. Rooftop and Impervious Area Disconnection to rain barrels, cisterns, or permeable areas is just one of seven site design options under Section 9.53.030(A)(3)(a), and it only applies to small development projects, including qualifying single-family homes, that create or replace between 2,500 and 5,000 square feet of impervious surface.
What size project triggers the site design requirement?
Projects, including detached single-family homes not part of a larger development plan, that create or replace between 2,500 and 5,000 square feet of impervious surface trigger the requirement. Projects at or above 5,000 square feet are instead classified as 'regulated projects' and must meet the chapter's full low-impact-development design standards under Section 9.53.030(B).
What are my other options besides installing rain barrels?
Section 9.53.030(A)(3)(a) lists six alternatives to rooftop disconnection: stream setbacks and buffers, soil quality improvement, tree planting and preservation, porous pavement or concrete, green roofs, and vegetated swales. You only need to implement one or more of the seven measures, not all of them, to satisfy the runoff-reduction requirement.
How do I prove my rooftop disconnection satisfies the county's requirement?
You must quantify the runoff reduction the measure achieves using the State Water Board's SMARTS Post-Construction Calculator, or another methodology the department of public works accepts, and submit that quantification with your project's civil plans for review and approval.

Sources & Official References

Other rules in Merced County

All Merced County rules

California rules heatmap·Compare Merced County to another location·View the California landscaping rules overview

Get notified when Rainwater Harvesting in Merced County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.