Merced County, CA Landscaping Rules: Rainwater Harvesting (2026)
Key Facts
- Applies to
- Projects creating/replacing 2,500-5,000 sq ft impervious surface
- Rooftop disconnection target
- Rain barrels, cisterns, or on-site permeable areas
- Compliance options
- 1 of 7 listed site design measures
- Documentation
- SMARTS Post-Construction Calculator or accepted method
- Larger projects
- 5,000+ sq ft face full LID standards instead
- Administering agency
- Department of Public Works
Summary
Small development projects in unincorporated Merced County that create or replace between 2,500 and 5,000 square feet of impervious surface, including qualifying single-family homes, must adopt at least one listed site design measure to cut runoff. Rerouting rooftop drainage to rain barrels, cisterns, or permeable areas is one of seven options under Section 9.53.030(A)(3)(a).
a. Small Development Projects. Small development projects that create and/or replace (including projects with no net increase in impervious surface) between 2,500 square feet and 5,000 square feet of impervious surface, including detached single family homes that create and/or replace 2,500 square feet or more of impervious surface and are not part of a larger plan of development shall implement one or more of the following site design measures to reduce project site runoff: ... iv. Rooftop and Impervious Area Disconnection. Reroute rooftop drainage pipes to drain rainwater to rain barrels, cisterns, or on-site permeable areas instead of the storm drain system.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4930839; v8 updated 2026-06-02).
Full Breakdown
030(A)(3)(a) requires 'small development projects,' those that create or replace, including projects with no net increase in impervious surface, between 2,500 and 5,000 square feet of impervious surface, including detached single-family homes crossing the 2,500-square-foot threshold that are not part of a larger plan of development, to implement one or more of seven listed site design measures to reduce project runoff. Rooftop and Impervious Area Disconnection is listed as option (iv): rerouting rooftop drainage pipes to rain barrels, cisterns, or on-site permeable areas instead of the storm drain system.
The other six options are stream setbacks and buffers, soil quality improvement, tree planting and preservation, porous pavement or concrete, green roofs, and vegetated swales. A project proponent choosing rooftop disconnection, or any other measure, must quantify the resulting runoff reduction using the State Water Board's SMARTS Post-Construction Calculator or another methodology the county accepts. 030(B) rather than this small-project menu. The chapter does not require rain barrels on every house; it is one compliance path among several, and only for qualifying projects within the 2,500-to-5,000-square-foot band. The department of public works administers and reviews the chosen measures as part of civil plan review for the project.
Violations & Fines
A qualifying small development project that fails to implement any of the listed site design measures, including rooftop disconnection, will not receive plan approval, and the county can withhold building permit or occupancy sign-off until the runoff-reduction requirement is satisfied. Continued noncompliance after development is treated as a Chapter 9.53 violation, subject to a written notice, stop-work order, and misdemeanor penalties under Chapter 1.28.
Frequently Asked Questions
Does Merced County require rain barrels on every new house?
What size project triggers the site design requirement?
What are my other options besides installing rain barrels?
How do I prove my rooftop disconnection satisfies the county's requirement?
Sources & Official References
Other rules in Merced County
California rules heatmap·Compare Merced County to another location·View the California landscaping rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.