Arapahoe County, CO Noise Ordinances: Decibel Limits (2026)
Key Facts
- Noise limit
- 60 dBA / 65 dBC at nearest property line
- Daytime bump allowed
- +10 dB(A), 15 min/hour, 7 a.m.–7 p.m. only
- Monitoring
- Continuous 15-min readings, first 6 months
- Record retention
- 2 years, available to County on request
- Fine schedule
- Up to $15,000/day per violation
- Applies to
- Permitted Oil & Gas Facilities only
Summary
Oil and gas facilities approved by Use by Special Review in unincorporated Arapahoe County cannot emit more than 60 dBA or 65 dBC measured at the nearest property line with an occupied structure. Daytime levels can spike 10 dB(A) for up to 15 minutes an hour between 7 a.m. and 7 p.m., but there is no such allowance overnight, under Land Development Code § 5-3.6.
ii. Noise emitted from the facility pad shall not exceed 60 dBA or 65dBC, measured at the nearest property line of the property with the nearest occupied structure. These noise levels, as measured, constitute the Maximum Permissible Limit of noise that may be allowed to emanate off site from the Oil and Gas Facility. iii. During the hours between 7:00 AM and 7:00 PM, the maximum permissible noise levels may be increased 10 dB(A) for a period not to exceed 15 minutes in any 1hour period... The increase in noise is not permissible between the hours of 7:00 PM to 7:00 AM.
Full Breakdown
This is the county's Maximum Permissible Limit for industrial-source noise, but it is scoped narrowly: it governs Oil and Gas Facilities operating under an Administrative Use by Special Review or Use by Special Review inside unincorporated Arapahoe County, not incorporated cities like Aurora or Centennial and not general commercial or manufacturing uses. The standard requires a County-approved third-party consultant to run continuous noise monitoring in 15-minute increments near the well site from construction through the first six months of production, with records kept for two years and made available to the County on request.
Before applying, the Operator must complete an ambient noise survey no more than 90 days before submitting the application and run noise modeling for drilling and completion activity; the results feed a required Noise Mitigation Plan that documents sound walls, Tier 4 diesel engines, mufflers, or Quiet Fleet-style equipment used to hold emissions under the limit. 5. Facility signage must post a 24-hour contact number for noise complaints alongside the ECMC hotline. 6, up to $15,000 for an initial violation and $15,000 per day it continues, appealable to the Board of County Commissioners within 14 days.
Ordinary industrial-zoned uses outside the oil-and-gas program instead follow the more general I-1/I-2 district rule that noise 'shall not extend beyond property lines,' without a decibel figure attached.
Violations & Fines
The Director issues a written Notice of Violation citing the noise reading and the specific requirement breached. Fines run up to $15,000 for an initial violation and up to $15,000 per day for each day the excess noise continues, due within 30 days of notice. Operators may appeal to the Board of County Commissioners within 14 days under § 5.3.6.P.7, but must pay the fine pending appeal, with a refund if the appeal succeeds.
Frequently Asked Questions
What is the maximum noise level allowed from an oil and gas facility?
Can a facility get louder during the day?
How does the County confirm compliance?
Can an operator get relief from the limit?
Does this decibel limit apply to regular industrial businesses too?
Sources & Official References
Other rules in Arapahoe County
Compare Arapahoe County to another location·View the Colorado noise ordinances overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.