Key Facts

Trigger threshold
10,000+ sq ft added GFA plus parking adjustment
Residential/lodging minimum
10% of required parking spaces
Commercial/public/industrial minimum
2% of required parking spaces
Permit required
Zoning Permit under Section 7.06.04.B.2
Space size
Matches standard space per Facilities Standards Manual

Summary

Loudoun County requires EV charging infrastructure only when a development triggers a parking adjustment, sits in an Urban, Suburban, or Office and Industrial district, and adds at least 10,000 square feet of gross floor area. Table 7.06.04-1 then sets minimums: 10% of parking for residential and lodging uses, 2% for commercial, public/civic, and industrial uses. Every charging space needs Zoning Permit approval.

These county ordinances apply to unincorporated areas of Loudoun County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A. Applicability. 1. Electric vehicle infrastructure and parking is not required unless: a. A parking adjustment has been approved pursuant to Section 10.16, Section 10.11.01, or Section 10.11.05; b. The site is located within an Urban, Suburban, or Office and Industrial Zoning District; and c. The development consists of at least 10,000 square feet of additional gross floor area. ... B. 1. Size. Any electric vehicle charging station parking space must meet the size of a parking space as required by the Facilities Standards Manual. 2. Zoning Permit. Electric vehicle charging spaces and infrastructure must receive Zoning Permit approval. C. ... Table 7.06.04-1 ... Residential Uses 10%; Lodging Uses 10%; Commercial Uses 2%; Public/Civic/Institutional Uses 2%; Industrial/Production Uses 2%.

Full Breakdown

Loudoun's Zoning Ordinance treats EV charging as a conditional requirement, not a blanket mandate. 05; the site sits within an Urban, Suburban, or Office and Industrial Zoning District; and the development adds at least 10,000 square feet of gross floor area. B. Every EV charging parking space must match the dimensions required for a standard space under the county's Facilities Standards Manual. 2, reviewed by the Department of Planning and Zoning before construction begins. 04-1 sets the minimum share of required parking that must be EV-capable by use category: residential and lodging developments must provide 10%, while commercial, public/civic/institutional, and industrial/production uses need only 2%.

Infrastructure, agricultural, and miscellaneous use categories are marked 'NR', not required, regardless of size. 04 becomes mandatory as a condition of that adjustment, closing the loophole where a project could win reduced parking counts without adding any charging capacity. Multifamily buildings, hotels, and other residential-category projects feel this rule most because their 10% ratio is five times higher than the commercial rate.

Violations & Fines

Installing or operating EV charging spaces without the required Zoning Permit is a zoning violation enforced by Loudoun County's Department of Planning and Zoning, which can require retrofitting, permit-after-the-fact fees, or removal of noncompliant equipment. Projects that received a parking adjustment but skip the Section 7.06.04 infrastructure condition risk revocation of that adjustment, forcing the development back to standard parking-ratio compliance before occupancy or site plan approval.

Frequently Asked Questions

Does every new building in Loudoun County need EV charging spaces?
No. EV charging is only mandatory when a project gets a parking adjustment under Section 10.16, 10.11.01, or 10.11.05, sits in an Urban, Suburban, or Office and Industrial district, and adds at least 10,000 square feet of gross floor area. Smaller projects or those in Rural and Transition districts face no EV charging mandate under Section 7.06.04.
How many EV charging spaces does a new apartment building need?
Table 7.06.04-1 sets residential uses at 10% of required parking spaces, the highest ratio in the table alongside lodging uses. A 200-space apartment garage that meets the applicability triggers would need at least 20 EV-capable spaces sized to standard Facilities Standards Manual dimensions.
Do EV charging stations need their own permit?
Yes. Section 7.06.04.B.2 requires Zoning Permit approval for EV charging spaces and infrastructure before installation, separate from any electrical permit for the charger itself. The Zoning Administrator reviews the permit as part of the county's standard zoning approval process.

Sources & Official References

Other rules in Loudoun County

All Loudoun County rules

Compare Loudoun County to another location·View the Virginia parking rules overview

Get notified when EV Charging in Loudoun County, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.