Charles County, MD Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Applies to
New single-family, duplex, townhome with garage/carport/driveway
Minimum EV-ready circuit
40-amp, 208/240-volt, NEMA 14-50R receptacle
Charging level required
At least Level 2 charging capability
Enforcing official
Charles County Building Code Official
Adopted
May 14, 2024, Bill No. 2024-10
Code chapter
Chapter 224, Building Construction, § 224-1.3(5)

Summary

New single-family houses, duplexes and townhomes built in Charles County with a garage, carport or driveway must include either a fully wired Level 2 EV charging space or an EV-ready parking space with a 40-amp, 208/240-volt circuit. The county added this requirement to its 2021 IECC amendments under § 224-1.3(4)-(5), effective with the May 2024 building code overhaul.

These county ordinances apply to unincorporated areas of Charles County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Modify the IECC to add Section R401.4, Electric vehicle charging: R401.4 Electric vehicle charging. Single-family detached houses, duplexes, and townhome units that include a separate garage, carport, or driveway shall include not less than: (i) one electric vehicle supply equipment (EVSE) installed parking space capable of providing at least level 2 charging; or (ii) one electric vehicle ready parking space in or on the garage, carport, or driveway. ELECTRIC VEHICLE READY PARKING SPACE. A dedicated parking with electrical panel capacity and full circuit installation of a minimum 40-ampere, 208/240-volt circuit, raceway wiring, a NEMA 14-50R receptacle, and circuit overcurrent protection devices to enable future installation of EVSE.

Full Breakdown

Charles County folds electric-vehicle infrastructure into its residential energy code rather than a stand-alone ordinance. Under Chapter 224, Building Construction, the county adopted the 2021 International Energy Conservation Code (IECC) in its entirety on May 14, 2024, by Bill No. 4 to it. That section requires that single-family detached houses, duplexes, and townhome units with a separate garage, carport, or driveway include not less than one electric vehicle supply equipment (EVSE) installed parking space capable of at least Level 2 charging, or one electric-vehicle-ready parking space in or on the garage, carport, or driveway.

The county also inserted new definitions into IECC Section R202: an EVSE-installed parking space runs wiring fully from the electrical panel to the parking space, while an electric-vehicle-ready parking space needs only the panel capacity and a full circuit, minimum 40-ampere, 208/240-volt, with raceway wiring, a NEMA 14-50R receptacle, and overcurrent protection, so a homeowner can add EVSE later without opening walls. Level 2 charging is defined as a minimum 208-volt alternating-current circuit meeting applicable industry safety standards. Compliance is checked at the plan-review and inspection stage by the Building Code Official, the title the amended codes use in place of 'Building Official' or 'Code Official' under § 224-1(3).

Because the requirement lives inside the adopted IECC rather than the zoning or subdivision chapters, it applies countywide to unincorporated Charles County new construction covered by the county's building permit process; it does not reach existing housing stock, since there is no retrofit mandate in the text.

Violations & Fines

Chapter 224 does not carry its own numeric fine for a missed EVSE or EV-ready space; enforcement instead runs through the Building Code Official's plan review and inspections under § 224-1(3). A single-family, duplex, or townhome permit that omits the required Level 2 EVSE space or 40-amp EV-ready circuit cannot pass the electrical rough-in or final inspection tied to R401.4, so the builder must correct the wiring before the county will issue a certificate of use and occupancy.

Frequently Asked Questions

Does Charles County require EV charging in new homes?
Yes. Under Code § 224-1.3(5), which adds IECC Section R401.4, any new single-family detached house, duplex, or townhome unit with a separate garage, carport, or driveway must include either one EVSE-installed parking space wired for Level 2 charging or one EV-ready parking space with a 40-amp, 208/240-volt circuit already roughed in. The builder chooses which option to install.
What counts as an 'EV-ready' parking space instead of full EVSE?
Charles County's IECC amendment defines an EV-ready parking space as one with electrical panel capacity and a full circuit already installed: a minimum 40-ampere, 208/240-volt circuit, raceway wiring, a NEMA 14-50R receptacle, and overcurrent protection devices. That lets a future owner plug in charging equipment without opening walls, even though no charger is installed at construction.
Does this rule apply to existing houses in Charles County?
No. Section R401.4 only governs new construction: single-family detached houses, duplexes, and townhome units built with a garage, carport, or driveway. Chapter 224 contains no retrofit mandate reaching homes already built, so an existing house is not required to add EVSE or EV-ready wiring under this section.
Who enforces the EV charging requirement?
The Charles County Building Code Official, the title Chapter 224 assigns in place of 'Building Official' or 'Code Official' under § 224-1(3), checks compliance during plan review and inspection of the electrical rough-in for qualifying new residential permits before final approval.

Sources & Official References

Other rules in Charles County

All Charles County rules

Compare Charles County to another location·View the Maryland parking rules overview

Get notified when EV Charging in Charles County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.