El Dorado County, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing chapter
El Dorado County Code Ch. 110.70
Adopting ordinance
Ord. No. 5165, 8-30-2022
State law basis
AB 1236, Gov. Code § 65850.7
Review type
ministerial, expedited permit
CUP trigger
written finding of specific adverse impact

Summary

El Dorado County runs an expedited, ministerial permit process for home and commercial EV charging stations under Chapter 110.70, following state law AB 1236. The Building Official can only demand a conditional use permit if the station poses a specific, documented safety impact.

These county ordinances apply to unincorporated areas of El Dorado County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

This chapter applies to the permitting of all electric vehicle charging stations within the unincorporated area of the County of El Dorado... The Building Official, consistent with Government Code § 65850.7, shall not condition the approval of an application on the approval of an association, as Civil Code § 4080 defines that term... The Building Official may require an applicant to apply for a conditional use permit if the Building Official makes a written finding, based on substantial evidence, that the proposed electric vehicle charging station could have a specific, adverse impact upon the public health or safety.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 13 Update 4).

Full Breakdown

70, adopted by Ordinance No. 5165 in 2022, applies to permitting of all electric vehicle charging stations in unincorporated El Dorado County, exempting stations already legally installed unless they are later physically modified enough to require new permitting. Before applying, an installer must verify the station will not create a specific, adverse impact on public health, safety, or building occupants, covering electrical system capacity and loads, wiring, bonding and overcurrent protection, affected building infrastructure, and the charging and parking area. An application meeting the County's adopted EV Checklist is deemed complete and processed promptly; the Building Official reviews it as a ministerial, ordinary permit limited to local, state, and federal health and safety requirements, and cannot condition approval on an association's approval under Civil Code Section 4080.

Approval alone does not authorize energizing the station until final building permit approval is granted. 090. Installed equipment must meet the California Electrical Code and be incorporated into the load calculations for the property's electrical service as a continuous load, and floor- or wall-mounted stations must meet the anchorage requirements of the California Building or Residential Code and the manufacturer's instructions.

Violations & Fines

An incomplete permit application draws a correction notice from the Building Official detailing the deficiencies rather than an outright denial. Energizing or using a charging station before final building permit approval, or installing one without meeting the California Electrical Code load and anchorage requirements, is enforceable as a building code violation subject to the County's standard misdemeanor penalty of up to $1,000.00 or six months in jail under Section 110.16.020(C).

Frequently Asked Questions

Do I need a special permit to install a home EV charger in El Dorado County?
You need a building permit reviewed under Chapter 110.70's expedited process. If your application meets the County's adopted EV Checklist, the Building Official must review it as a ministerial permit limited to health and safety requirements.
Can my HOA block my EV charging station permit?
No. Section 110.70.060(D) bars the Building Official from conditioning approval of an EV charging station application on approval from a homeowners association as defined in Civil Code Section 4080.
When can the County require a conditional use permit instead?
Only if the Building Official makes a written finding, based on substantial evidence, that the charging station could cause a specific, adverse impact on public health or safety; that decision can be appealed to the Planning Commission.

Sources & Official References

Other rules in El Dorado County

All El Dorado County rules

California rules heatmap·Compare El Dorado County to another location·View the California parking rules overview

Get notified when EV Charging in El Dorado County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.