Sarasota County, FL Parking Rules: EV Charging (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Type
Optional incentive, not a mandate
Exemption cap
First 15 EV spaces excluded from parking count
Beyond the cap
16th+ EV space counts as required parking
Governing ratio table
UDC Sec. 124-120(g)(2) parking table
Citation
UDC Sec. 124-120(g)(6)

Summary

Sarasota County lets developers install electric-vehicle charging stations and reserve dedicated EV parking spaces without those spaces counting against a site's minimum or maximum parking totals, up to 15 spaces. Beyond that 15-space threshold, any additional EV-dedicated spaces do count toward the required parking total set by the use table in UDC Sec. 124-120(g)(2), under Sec. 124-120(g)(6).

City-specific rules exist: North Port has its own ev charging rules that differ from Sarasota County's county-level regulations. If you live in North Port, check the city-specific page instead.

(6)Parking with Charging Capability for Electric Vehicles. Applicants may provide electric vehicle charging infrastructure in parking facilities with specific spaces adjacent to and associated with this infrastructure to be reserved for electric vehicle use.a.Spaces dedicated for electric vehicles shall not be included in the calculations for minimum and maximum parking spaces from the table in Section 124-120(g)(2), up to a maximum of 15 spaces.b.These spaces may be provided independently of the required parking spaces, up to a maximum of 15 parking spaces.c.After the maximum 15 parking spaces dedicated for electric vehicles, any additional spaces dedicated for electric vehicles shall count toward the required parking in Section 124-120(g)(2).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 98).

Full Breakdown

UDC Sec. 124-120(g)(6), Parking with Charging Capability for Electric Vehicles, is written as an incentive rather than a mandate: applicants "may provide" EV charging infrastructure in a parking facility and reserve specific spaces next to it for electric-vehicle use. The benefit is in how those spaces get counted against the site's parking requirement. Sec. 124-120(g)(2) sets the minimum and maximum parking ratios by use, and normally every space on a site counts toward that ratio. carves out an exception: spaces dedicated to electric vehicles are excluded from the minimum and maximum parking calculations entirely, up to a cap of 15 spaces.

reinforces that those first 15 EV spaces can be built independently of, and in addition to, the required parking spaces, so a project is not forced to shrink its regular parking count to make room for chargers. requires any further EV spaces to count toward the required parking total under the Sec. 124-120(g)(2) table just like ordinary spaces. In practice, a shopping center or office building can add its first 15 charging-capable spaces as bonus parking beyond what the code otherwise demands, but a 16th EV space starts eating into the site's regular parking allotment rather than adding to it, which caps how much of a lot's total capacity can be converted to EV-only use under this incentive.

Violations & Fines

There is no standalone penalty tied to this rule because it is optional: nothing in Sec. 124-120(g)(6) forces a project to add EV charging. Where a developer does claim the exemption, county staff verify the EV space count against the Sec. 124-120(g)(2) parking table during Site Development Plan review, and miscounting EV spaces against the 15-space cap, or under-building regular spaces once that cap is exceeded, holds up plan approval until the parking tally is corrected.

Frequently Asked Questions

Does Sarasota County require EV charging at new developments?
No. UDC Sec. 124-120(g)(6) says applicants "may provide" EV charging infrastructure; it is an optional incentive, not a mandate. A project can be built with zero EV-dedicated spaces and still fully comply with the county's parking chapter under Sec. 124-120(g)(2).
How many EV charging spaces can a project add without triggering more parking requirements?
Up to 15. Spaces dedicated to electric vehicle charging are excluded from the minimum and maximum parking calculations in the Sec. 124-120(g)(2) table for the first 15 such spaces, and they can be built in addition to the otherwise-required parking count.
What happens after the 15th EV-dedicated space?
Every EV space beyond the 15th counts toward the site's required parking total under the Sec. 124-120(g)(2) table just like a standard space, so a project cannot use the EV incentive to add unlimited charging-only parking beyond what the underlying use requires.

Sources & Official References

Other rules in Sarasota County

All Sarasota County rules

Florida rules heatmap·Compare Sarasota County to another location·View the Florida parking rules overview

Get notified when EV Charging in Sarasota County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Cities Across Sarasota County