Skip to main content
CityRuleLookup

Santa Cruz County, CA Property Maintenance: Property Blight (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing code
SCCC § 12.10.425, amending 1997 UCASGH
Appeal window
30 days (10 days if posted immediately dangerous)
Hearing scheduling
15-60 days after appeal filed
Determining officials
Building Official (structural), County Geologist (geologic)
Recorded notice
certificate filed with County Recorder

Summary

Unincorporated Santa Cruz County enforces a locally amended Uniform Code for the Abatement of Structural and Geologic Hazards, letting the Building Official or County Geologist declare a dangerous building or site a public nuisance and order repair, vacation or demolition, with appeal rights to a County Hearing Officer.

These county ordinances apply to unincorporated areas of Santa Cruz County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

402 Recordation of Notice and Order. If compliance is not had with the order within the time specified therein, and no appeal has been properly and timely filed, the Director or designee may file in the office of the County Recorder a certificate describing the property and certifying (i) that the building or site or portion thereof is dangerous and (ii) that the owner has been so notified. Whenever the corrections ordered shall thereafter have been completed or the building demolished and/or the geologic conditions mitigated to a level acceptable to the County so that it no longer exists as a dangerous building or site or portion thereof on the property described in the certificate, the Director or designee shall file a new certificate with the County Recorder certifying that the building has been demolished or all required corrections have been made.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 5004302; v11 updated 2026-05-19; through 05-19-2026).

Full Breakdown

425 retitles and amends it as the Uniform Code for the Abatement of Structural and Geologic Hazards. 1, the Building Official determines whether a building or structure is dangerous and unsafe, while the County Geologist makes that call for geologic conditions; the Director or designee administers the abatement process. Amended Section 202 authorizes the Director to initiate proceedings to abate a dangerous building or site as a public nuisance by repair, rehabilitation, demolition, or removal once an inspection supports that finding. 1 lets the Director commence formal proceedings once an inspection shows the building or site is dangerous, and Section 402 allows recording a certificate with the County Recorder identifying the property as dangerous; a follow-up certificate clears the record once corrections are complete or the building is demolished.

1 requires a written appeal within 30 days of service (10 days if the building is posted as immediately dangerous under Section 404), containing a caption, statement of legal interest, statement of the order protested, relief sought, signatures, and a declaration under penalty of perjury. The Hearing Officer must set a hearing date between 15 and 60 days after filing, with 10 days' written notice, and enforcement of the order is stayed while a timely appeal is pending.

Violations & Fines

A building or site found dangerous and left unabated after a Director's order can be recorded as a public nuisance with the County Recorder; owners who miss the 30-day appeal window (10 days for postings under Section 404) waive their right to a hearing, and the County may proceed to require repair, rehabilitation, demolition, or removal at the owner's expense.

Frequently Asked Questions

Who decides if a building is dangerous in unincorporated Santa Cruz County?
The Building Official makes that determination for structural conditions, and the County Geologist makes it for geologic hazards, under Section 201.1 of the county's amended Uniform Code for the Abatement of Structural and Geologic Hazards (SCCC § 12.10.425).
How long do I have to appeal a dangerous-building order?
Amended Section 501.1 gives you 30 days from service of the notice and order to file a written appeal with the Department. If the building has been posted as immediately dangerous under Section 404, that window shrinks to 10 days, and missing it waives your right to a hearing.
What happens if I don't fix a building the County has flagged as dangerous?
Under amended Section 402, the Director or designee can record a certificate with the County Recorder describing the property as dangerous. That recorded notice stays on title until a new certificate is filed confirming the required repairs are complete or the building has been demolished.

Sources & Official References

Other rules in Santa Cruz County

All Santa Cruz County rules

California rules heatmap·Compare Santa Cruz County to another location·View the California property maintenance overview

Get notified when Property Blight in Santa Cruz County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Property Blight in Cities Across Santa Cruz County