Merced County, CA Sidewalk & Pedestrian Rules: Encroachment Permits (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required for
any work in county road right-of-way
Driveway permit fee
$102
Major project security
100% of construction cost
Advance notice
24 hours before work starts
Violation penalty
misdemeanor under § 1.28.030
Enforcing agency
Dept. of Public Works, road division

Summary

Merced County requires an encroachment permit from the Department of Public Works before anyone digs, builds, or installs a driveway, pipe crossing, or utility line within, under, or over a county road right-of-way. The permit chapter supplements the Streets and Highways Code and applies to individuals, contractors, corporations, utilities, and other government agencies working on county highways.

These county ordinances apply to unincorporated areas of Merced County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The purpose of this chapter is to supplement the Streets and Highway Code, Division 2, Chapter 5.5, The Care and Protection of County Highways by defining the procedures which the county will follow and the fees that will be charged related to the issuance of encroachment permits on county highways. All individuals, contractors, corporations, utilities, and other governmental agencies proposing to conduct any activity not authorized by the vehicle code, within, under or over any county roadway must first obtain an encroachment permit issued by the county prior to conducting that activity. However, contractors already under contract with the road division of public works to perform work within such roadways or private and public surveyors conducting activities within said roadways are not required to obtain an encroachment permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4930839; v8 updated 2026-06-02).

Full Breakdown

30 sets the encroachment permit system administered by the Public Works road division. A minor non-utility permit costs $102 for a driveway or shoulder-area work and $147 for pipe crossings or pavement-area work. 74% above $725,000. Utility companies can obtain an annual maintenance permit for $58 or a specific project permit priced by improvement value; work within the recovery zone outside the right-of-way carries no charge. Applicants must submit improvement plans prepared by a licensed professional on major projects, a certificate of workers' compensation insurance under Labor Code Section 3800, and written permission from any storm drainage, sewer, water, or irrigation district whose facilities the work would alter.

Major projects must post security equal to 100% of estimated construction cost for performance and 50% for labor and materials. Applicants must notify the road division at least 24 hours before starting work, except emergency repairs, which require notice by the end of the next business day. Contractors already under a road-division contract and licensed land surveyors performing survey work are exempt from the permit requirement entirely.

Violations & Fines

The Director of Public Works may cite anyone doing unpermitted work in a county road right-of-way, and a violation of Chapter 13.30 is a misdemeanor punishable under Merced County Code Section 1.28.030. The Director can also revoke a permit if work isn't completed on schedule, then finish the job with county forces or an outside contractor and bill the applicant for the cost.

Frequently Asked Questions

Do I need a permit to put in a new driveway off a county road in Merced County?
Yes. Merced County Code Section 13.30.040 requires an encroachment permit before any construction within the road right-of-way, and Section 13.30.030 sets the driveway fee at $102, collected before the permit is issued.
What happens if I do the work without a permit?
The Director of Public Works can issue a citation, and Section 13.30.050 makes a violation of the encroachment chapter a misdemeanor punishable under Section 1.28.030 of the county code.
Are utility companies required to get a new permit for every repair?
No. Section 13.30.030 lets a utility buy an annual maintenance permit for $58 covering routine repairs; larger projects still need a specific project permit priced by construction value.
Is there an exception for emergency utility repairs?
Yes. Section 13.30.040(B)(7) allows emergency repairs to pipes or conduits, or excavations necessary to preserve life or property, without a permit in hand first, provided the responsible party notifies the Department of Public Works on the first business day the office reopens.

Sources & Official References

Other rules in Merced County

All Merced County rules

California rules heatmap·Compare Merced County to another location·View the California sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Merced County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.