Summary

Building or repairing a driveway, curb, sidewalk, gutter, or retaining wall within a Madera County road right-of-way requires a construction permit from the road commissioner before work begins.

City-specific rules exist: Madera has its own encroachment permits rules that differ from Madera County's county-level regulations. If you live in Madera, check the city-specific page instead.

The provisions of this chapter apply only to permits for the laying, constructing, reconstructing, or repairing of curbs, sidewalks, gutters, driveways, highway surfaces, retaining walls, storm drains, culverts, or other appurtenant highway structures.B.This chapter also applies to permits for the constructing, reconstructing, or repairing by any private individual, copartnership, firm or private corporation of any highway light, or highway lighting system in any highway or in any privately owned thoroughfare which is open to public travel. (Ord. 222 §§ 75, 75.1, 1955).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 52).

Full Breakdown

Madera County Code § 11.24.010 requires a permit for laying, constructing, reconstructing, or repairing curbs, sidewalks, gutters, driveways, highway surfaces, retaining walls, storm drains, culverts, and other appurtenant structures within the county road right-of-way, plus private highway-lighting work. Applicants file plans and pay an issuance fee under Chapter 11.12, and residential driveway permits carry added dimensional limits, curb-to-property distance of no more than 10 feet, under § 11.24.070. Work must start within 60 days of issuance or the road commissioner may revoke the permit under § 11.24.140.

Violations & Fines

Constructing or altering a driveway, curb, sidewalk, or other structure in the county right-of-way without a permit exceeds the road commissioner's authorization and can trigger permit denial, revocation, or required removal at the owner's cost.

Frequently Asked Questions

Do I need a permit to pave my driveway in unincorporated Madera County?
Yes. Madera County Code § 11.24.010 requires a construction permit from the road commissioner before work in the right-of-way begins.
What if I skip the encroachment permit?
The work isn't authorized; the road commissioner can require removal or restoration and withhold further permits until fees are paid, under §§ 11.12.060 and 11.24.140.

Sources & Official References

Other rules in Madera County

All Madera County rules

California rules heatmap·Compare Madera County to another location·View the California sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Madera County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Encroachment Permits in Cities Across Madera County