McHenry County, IL Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Inverter standard
UL 1741 listed and labeled
Ground-mount fire separation
7 feet from other structures
Roof load design
Two load cases under R324.4.1
Design standard
McHenry County UDO and NFPA 70
Permit route
Standard IRC building permit
Effective date
January 1, 2023

Summary

Rooftop and ground-mounted solar panels in unincorporated McHenry County are permitted under the county's amended 2021 International Residential Code, not through a separate solar-only process. Photovoltaic systems must use UL 1741-listed inverters, meet roof-load engineering for the added panel weight, and keep ground-mounted arrays at least 7 feet from any other structure.

These county ordinances apply to unincorporated areas of McHenry County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

R324.3 Photovoltaic systems. Photovoltaic systems shall be designed and installed in accordance with the McHenry County Unified Development Ordinance, Sections R324.3.1 through R324.7.2.5 and NFPA 70. Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use inverters listed for utility interaction. ... R324.4.1 Roof load. ... Roof structures that provide support for photovoltaic panel systems shall be designed for the following load cases: (1) Dead Load (including photovoltaic panel weight) plus snow load in accordance with Table R301.2(1) (2) Dead Load (excluding photovoltaic panel weight) plus roof live load or snow load, whichever is greater, in accordance with Section R301.6. ... R324.7.1 Fire separation distances. Ground- mounted photovoltaic systems shall maintain a fire separation distance of 7 feet 0 inches from any other accessory or principle structure or as required by the McHenry County Unified Development Ordinance.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-5: Supplement contains: Local legislation current through Ord. A25-0037, passed 8-19-2025 | State legislation current through ALS 2025 Pamphlet No. 1).

Full Breakdown

McHenry County's Planning & Development Department reviews solar installations through Section 15.08.010's amendment to Section R324, Solar Energy Systems, part of the same 2021 IRC amendment package, Ordinance O-202211-10-052, effective January 1, 2023, that governs all residential construction permits. Photovoltaic systems must be 'designed and installed in accordance with the McHenry County Unified Development Ordinance...and NFPA 70,' and every inverter 'shall be listed and labeled in accordance with UL 1741'; systems tied to the grid must use inverters specifically listed for utility interaction. Solar thermal systems installed for water or space heating are separately routed to the Unified Development Ordinance and the International Fire Code rather than the photovoltaic provisions.

Structural review is not optional. R324.4.1 requires roof structures supporting photovoltaic panels to be engineered for two load cases: dead load including the panel weight plus snow load per Table R301.2(1), and dead load excluding panel weight plus roof live load or snow load, whichever governs, per Section R301.6. For ground-mounted arrays, R324.7.1 sets a fire separation distance of 7 feet 0 inches from any other accessory or principal structure on the lot, unless the Unified Development Ordinance requires more.

Because solar work is folded into the standard building permit rather than issued as its own category, the same Planning & Development plan review, County Board fee schedule, and inspection sequence used for other residential alterations applies to a photovoltaic installation.

Violations & Fines

Solar installations fall under the same IRC amendment package as the rest of residential construction, so an inverter that isn't UL 1741-listed, a roof not engineered for the added load, or a ground-mounted array closer than 7 feet to another structure is a violation of the amended code carrying the Section 15.08.020(B) minimum fine of $200 per offense, with each week uncorrected treated as a separate offense.

Frequently Asked Questions

Do I need a permit to install rooftop solar panels in unincorporated McHenry County?
Yes. Photovoltaic systems are regulated under Section 15.08.010's R324 amendment to the county's adopted IRC, so they go through the same Planning & Development building permit and inspection process as any other residential construction, not a separate solar-only permit.
What inverter standard does McHenry County require?
Section R324.3 requires every inverter to be 'listed and labeled in accordance with UL 1741,' and a system connected to the utility grid must use an inverter that is specifically listed for utility interaction rather than a generic UL 1741 model, per the county's amended residential code.
How far from my house does a ground-mounted solar array have to sit?
R324.7.1 sets a minimum fire separation distance of 7 feet 0 inches between a ground-mounted photovoltaic system and any other accessory or principal structure on the property, unless the McHenry County Unified Development Ordinance requires a greater distance for the specific site.
Does my roof need extra engineering to carry solar panels?
Yes. R324.4.1 requires the supporting roof structure to be designed for two load cases: dead load including the panel weight plus snow load, and dead load excluding the panels plus roof live load or snow load, whichever is greater, so a standard roof design alone is not sufficient.

Sources & Official References

Other rules in McHenry County

All McHenry County rules

Compare McHenry County to another location·View the Illinois solar energy overview

Get notified when Panel Permits in McHenry County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.