Clarksville, TN Solar Energy: Panel Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Zoning treatment
Utility accessory use, section 5.3.7
Setbacks
Must meet district required setbacks
Serving limit
Only the property it sits on
Electrical code
2017 National Electric Code
Utility rule
Lockable, labeled disconnect switch required

Summary

Clarksville permits solar panels as a utility accessory use subject to setbacks. The distinctive local requirement is code section 4-310: any grid-tied generator needs a lockable, accessible load-break disconnect switch approved by CDE Lightband.

Electric generators of any type and size, interconnected to CDE Lightband's (CDE) electric grid in any way, shape, form, fashion, or means, including wind, solar, fuel cell, reciprocating engine, hydro, and other similar electric generation devices, are required by CDE to install a load-break AC disconnect or transfer switch (Switch) between CDE facilities and the interconnected customer's equipment.

Source: City of Clarksville Code of OrdinancesView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 110 Update 2 | Zoning Ordinance: Supplement 6).

Full Breakdown

The switch sits on the customer's side of the interconnection, isolates automatically when CDE power is lost and manually on demand, stays accessible to CDE personnel at all times, sits near CDE's point of delivery, shows a visible open point, accepts a padlock in the open position, and is labeled Generator Disconnect Switch or Generator Transfer Switch. Failing to notify CDE, or installing a non-conforming switch, brings immediate disconnection of electric service. Reconnection follows inspection and approval by the Building and Codes Department. Clarksville has adopted the 2017 National Electric Code and the 2018 International Building Code, and an electrical permit is required before wiring changes.

Violations & Fines

Non-notification or a non-conforming switch results in immediate disconnection of electric service by CDE Lightband. Service returns only after the switch passes Building and Codes inspection.

Frequently Asked Questions

Do I need a permit for rooftop solar in Clarksville?
Yes. An electrical permit is required before any wiring change under section 4-304.5, and a building permit may also apply. Building and Codes inspects before CDE Lightband energizes the system.
Can I install ground-mounted panels for a neighbor's house?
No. Zoning Ordinance 5.3.7 says the structure may only serve the property it is located on, and it must meet all required setbacks for the district.
Why does CDE require a disconnect switch?
So line crews can isolate your generator from the grid during outages, maintenance and restoration. It must be padlockable in the open position and reachable by CDE staff at any time.

Sources & Official References

Other rules in Clarksville

All Clarksville rules

Compare Clarksville to another location·View the Tennessee solar energy overview

Get notified when Panel Permits in Clarksville, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.