Pearl City homeowners in Pacific Palisades and Waimalu can use ROH Sec. 18-5.10 expedited permitting for solar PV up to 20kW, useful for offsetting high family electricity bills.
Pearl City's single-family homes, especially south-facing roofs in Pacific Palisades above the H-1, can host productive residential PV arrays. ROH Sec. 18-5.10 provides expedited permitting for qualifying clean energy projects, including residential solar PV up to 20kW. Installations must still comply with ROH Chapter 16 (Building Code) and Chapter 17 (Electrical Code). The solar readiness requirement in Honolulu Building Code Sec. R408 reserves space for a 5kW AC PV array on new single- and two-family dwellings. Municipal solar PV policy is at ROH Sec. 2-38.1. State reference: HRS Chapter 269, Sections 101 through 111.
Unpermitted solar work can trigger stop-work orders, removal requirements, and complications with HECO interconnection and homeowner insurance claims.
See how other cities in Honolulu County handle panel permits.
See how Pearl City's panel permits rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.