Swimming pool permit rules in Berkeley County, SC, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Residential pool permit fee
$50.00 flat fee
Permit trigger
In-ground, or aboveground 4ft+
Commercial pool requirement
DHEC approval letter required
Electrical
Separate permit for pumps/lights
Max fine
$200.00 under Sec. 1-8(c)

Summary

Berkeley County requires a building permit for any in-ground pool and for aboveground pools four feet or taller under Sec. 11-90 of the county code. Residential permits cost a flat $50.00 with a plot plan showing setbacks; commercial pools need a DHEC approval letter and cost-based fees plus civil drainage plans.

These county ordinances apply to unincorporated areas of Berkeley County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Residential. A permit is required for aboveground swimming pools where the height of the pool is four feet or greater and all in-ground pools. The permit fees for both pool permits will be $50.00. A plot plan will be required at the time of submission for plans review, indicating all set backs are met. Commercial. An approval letter from DHEC is required when submitting for a commercial pool permit. The fees will be based on the cost of construction stated on the signed contract or proposal. Civil plans indicating drainage and impervious surface will be required to be submitted at the time of application for permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 37).

Full Breakdown

Sec. 11-90 of the Berkeley County Code of Ordinances splits swimming pool permitting into two tracks. 00, and the applicant must submit a plot plan at the time of plans review showing that all setbacks are met. For commercial pools, an approval letter from DHEC is required before the county will accept the permit application, the fee is based on the cost of construction stated in the signed contract or proposal, and civil plans showing drainage and impervious surface must be submitted with the application, in addition to a plot plan confirming setback compliance.

The height trigger for aboveground pools tracks the exception the county wrote into its adopted International Residential Code in Sec. 2(7) to read 'Prefab pools that are 4' or greater in height,' meaning smaller kiddie and inflatable pools under four feet fall outside the permit requirement. A separate electrical permit is always required for pool pumps, lights, and receptacles regardless of pool type, and final inspection cannot be scheduled until the pool's safety barrier is in place, per the same section.

Violations & Fines

Building or filling a pool without the required Sec. 11-90 permit is a building-code violation subject to the Sec. 1-8(c) penalty for adopted technical codes: a fine of up to $200.00, imprisonment up to 30 days, or both, with each day of noncompliance a separate offense. The chief building official may also refuse a certificate of occupancy and, under Sec. 11-100, order disconnection of electrical service to an unpermitted pool installation.

Frequently Asked Questions

Do I need a permit for an aboveground pool in Berkeley County?
Only if it is four feet or taller. Sec. 11-90 requires a permit for aboveground pools of that height or greater and for all in-ground pools, with a flat $50.00 residential fee and a plot plan showing setback compliance.
What does a commercial pool need that a residential pool does not?
Sec. 11-90 requires commercial pool applicants to submit an approval letter from DHEC plus civil plans showing drainage and impervious surface, and the fee is based on the signed construction contract price rather than the residential flat fee.
Is an electrical permit included with my pool permit?
No. Sec. 11-90 requires a separate electrical permit for pumps, lights, and receptacles in addition to the building permit for the pool structure itself.

Sources & Official References

Other rules in Berkeley County

All Berkeley County rules

Compare Berkeley County to another location·View the South Carolina swimming pools & spas overview

Get notified when Pool Permits in Berkeley County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.