Skip to main content
CityRuleLookup

Washington County, OR Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Washington County, OR, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit issuer
Washington County Health Department
Construction permit fee
$25 flat, § 14.08.100
Plans required
Stamped by a registered engineer/architect
Denial appeal
10 days' notice to the board clerk
Built-to-plan rule
Must match approved plans, § 14.08.130
Separate permit
Annual operation permit also required

Summary

Before anyone builds, installs, enlarges or substantially remodels a swimming pool in unincorporated Washington County, the health department, not the building division, must issue a $25 construction permit after reviewing engineered plans, water source details and pump specifications. Denials can be appealed to the county board within ten days.

City-specific rules exist: Beaverton has its own pool permits rules that differ from Washington County's county-level regulations. If you live in Beaverton, check the city-specific page instead.

14.08.070 - Construction permit—Required. No person shall construct, install, enlarge, or substantially remodel any swimming pool without having first obtained a permit from the health department. This permit is in addition to any other pertinent permit or other requirements of the state or county. ... 14.08.100 - Construction permit—Application—Fee. The application must be accompanied with a permit fee in the amount of twenty-five dollars.

Source: WC Building ServicesView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Community Development Code: Supplement 2 | Code of Ordinances: Supplement 25).

Full Breakdown

070 is direct: "No person shall construct, install, enlarge, or substantially remodel any swimming pool without having first obtained a permit from the health department. 090). 100 sets the application fee at a flat twenty-five dollars. 120). 130 requires the pool to be "constructed in conformity with the approved plans", deviating from the approved set is itself a violation, separate from having skipped the permit altogether. 170 for pools that are not private residential.

Violations & Fines

Building or substantially remodeling a pool without the § 14.08.070 construction permit exposes the owner to the same closure and citation authority the health department uses against unsafe pools generally: enforcement runs through §§ 14.08.230, 14.08.250 and the nuisance-abatement path in § 14.08.260. Constructing a pool that departs from the plans the health department actually approved is also a standalone violation of § 14.08.130, independent of whether a permit was pulled in the first place.

Frequently Asked Questions

Who issues a swimming pool construction permit in Washington County?
The health department, not the building division, § 14.08.070 requires a permit from the health department before anyone constructs, installs, enlarges or substantially remodels a swimming pool, in addition to any other state or county permit that applies.
What has to be in the permit application?
Section 14.08.090 requires complete plans stamped by a registered engineer or architect, a description of the water supply and treatment methods, storm and sanitary sewer service details including any subsurface disposal system, and pump performance data for recirculating the pool water, filed on health department forms under § 14.08.080.
How much does the construction permit cost?
Section 14.08.100 sets a flat $25 application fee, and § 14.08.160 notes that paying the construction permit application fee also covers the operation permit fee for the balance of the first year the pool operates.
What if the health department denies my application?
Section 14.08.120 requires a written statement of the reasons for denial and, where feasible, what changes would allow approval; you can appeal the denial to the board of county commissioners as long as notice reaches the board clerk within ten days of the denial.

Sources & Official References

Other rules in Washington County

All Washington County rules

Compare Washington County to another location·View the Oregon swimming pools & spas overview

Get notified when Pool Permits in Washington County, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Pool Permits in Cities Across Washington County