Skip to main content
CityRuleLookup

Cameron County, TX Water Use Rules: Recycled Water Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Ch. 1 § 2.4 Greywater Systems
Municipal/organized systems
Must meet 30 TAC Chapter 210
On-site systems
Must meet 30 TAC Chapter 285
Applies to
Subdivisions of 5 acres or less
Administered by
Texas Commission on Environmental Quality
Civil penalty
$500-$1,000 per violation per day

Summary

In unincorporated subdivisions of five acres or less, a subdivider who proposes to reuse treated wastewater (greywater) must design the system to the state's own reclaimed-water rules: 30 TAC Chapter 210 for a municipal or organized sewerage system, or Chapter 285 for an on-site facility, under Section 2.4 of the county's Subdivision Rules.

These county ordinances apply to unincorporated areas of Cameron County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

2.4 Greywater Systems for Reuse of Treated Wastewater

A. Organized or municipal sewerage systems. Any proposal for sewage collection, treatment and disposal which includes greywater reuse shall meet minimum criteria of 30 TAC Chapter 210 promulgated and administered by the Commission.

B. On-site sewerage facilities. Any proposal for on-site sewage disposal which includes provisions for greywater use shall meet the minimum criteria of 30 TAC Chapter 285.

Full Breakdown

Cameron County doesn't run its own greywater code. 4 of Chapter 1 of the county's Subdivision Rules and Regulations, the Model Subdivision Rules that apply to any unincorporated subdivision creating two or more lots of five acres or less for residential use, folds the state's reclaimed-water standards directly into the plat-approval process. A subdivider whose sewage collection and treatment proposal for an organized or municipal system includes reusing treated wastewater must meet the minimum design criteria of 30 TAC Chapter 210, administered by the Texas Commission on Environmental Quality (called 'the Commission' throughout these rules).

B. 39, and larger systems fall under Chapter 317. 5, which cites 30 TAC Chapters 312 and 317. Because the county incorporates these state design chapters by reference rather than writing its own greywater standard, the practical requirement for a developer is engineering approval showing the proposed reuse system meets whichever TAC chapter applies before the county will approve the final plat.

Violations & Fines

A subdivider whose greywater or sewage design doesn't meet the required TAC chapter risks having final plat approval withheld during the county's review. Separately, Chapter 2, Section 5.2 exposes anyone who violates these Subdivision Rules or Local Government Code Chapter 232 to a civil penalty of $500 to $1,000 per violation per day (capped at $5,000 a day), plus the county's court costs, investigative costs and attorneys' fees; knowingly failing to file a required plat is a Class A misdemeanor.

Frequently Asked Questions

Does Cameron County have its own greywater ordinance?
No. Section 2.4 of the county's Subdivision Rules and Regulations incorporates the state's own reclaimed-water design chapters instead of writing a local standard: 30 TAC Chapter 210 for reuse tied to an organized or municipal sewage system, and 30 TAC Chapter 285 for reuse tied to an on-site septic or aerobic system.
Which subdivisions does this rule cover?
Only unincorporated subdivisions that create two or more lots of five acres or less intended for residential use, under Chapter 1's Model Subdivision Rules. Larger or non-residential subdivisions fall under Chapter 2 instead, and land inside Brownsville, Harlingen, San Benito or another city follows that city's own code.
What happens if a developer's greywater design doesn't meet the state chapter?
The county can withhold final plat approval until the engineering report shows compliance, and a subdivider who otherwise violates these rules faces a civil penalty of $500 to $1,000 per day under Chapter 2, Section 5.2, capped at $5,000 a day, plus court costs, investigative costs and attorneys' fees.

Sources & Official References

Other rules in Cameron County

All Cameron County rules

Texas rules heatmap·Compare Cameron County to another location·View the Texas water use rules overview

Get notified when Recycled Water Rules in Cameron County, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Recycled Water Rules in Cities Across Cameron County