Pembroke Pines, FL Accessory Structures: Garage Conversions (2026)
Garage conversion rules in Pembroke Pines, FL, sometimes called garage-to-ADU or accessory living unit conversions, govern permits, ceiling height, egress, and parking replacement.
Key Facts
- Governing section
- § 155.621(A)(7)
- Front garage door
- Must be removed if converted
- Unit size
- 300 to 1,000 sq ft
- ADUs per lot
- One maximum
- Parking added
- 1 paved space required
- Septic lots
- ADUs prohibited
- Permit
- Florida Building Code permit required
Summary
Pembroke Pines lets a homeowner turn an attached garage into a legal accessory dwelling unit, but the Land Development Code demands specific work: if the garage door faced the street it must come out, the opening enclosed to match the house's finishes and color, and the whole unit must meet size, parking, and permitting standards under Code of Ordinances § 155.621(A)(7).
Where an attached garage on the front façade of a structure is converted to an accessory dwelling unit, the garage door shall be removed, and the enclosure must be architecturally compatible with the style of the building including finishes and color scheme.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-61: Supplement contains: Local legislation current through Ord. 2056, passed 12-11-25).
Full Breakdown
621(A)(7)(d)5, a garage converted into an accessory dwelling unit (ADU) on the front façade of a structure must have its garage door removed entirely, and the resulting enclosure must be architecturally compatible with the style of the building, including finishes and color scheme, so painting over or leaving the door in place does not satisfy the rule. 621(A)(7). An ADU is permitted only as accessory to a single-family dwelling on the same lot, capped at one per lot, and it cannot be established before the principal building has been built or on any lot serviced by septic.
The converted unit must run between 300 and 1,000 square feet of floor area and stay smaller than the principal dwelling; for a detached conversion, that cap covers the combined footprint of the living space plus any attached storage, bathroom, or laundry area. The unit must function as a complete residence with its own kitchen, bathroom, and living or bedroom space, and a paved walkway at least two feet wide must connect its entrance to the required off-street parking. The homeowner must add one additional paved parking space, on top of what the main house already needs, located entirely on the property.
621(A)(7)(d)6, meaning a building permit through the city's Building and Zoning Department, not a simple homeowner remodel. The lot must also meet the zoning district's minimum lot-area requirement and cannot later be subdivided to split the ADU from the main house unless the split independently satisfies every zoning standard.
Violations & Fines
Chapter 155 carries no ADU-specific fine schedule, so an unpermitted garage conversion falls under the city's general penalty, § 10.99: up to a $500 fine, up to 90 days in jail, or both, with each day the violation continues counted as a separate offense. In practice, Code Enforcement documents the illegal conversion and refers it to the city's Code Enforcement Board or Special Magistrate process under Chapter 32 before any fine is imposed.
Frequently Asked Questions
Do I have to remove my garage door to convert it into an ADU in Pembroke Pines?
How big can a garage-conversion ADU be?
Can I convert a garage into an ADU on a lot with a septic system?
Do I need a building permit for a garage-to-ADU conversion?
Sources & Official References
Other rules in Pembroke Pines
Florida rules heatmap·Compare Pembroke Pines to another location·View the Florida accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Garage Conversions in Nearby Cities
How other cities in Broward County handle garage conversions.