Benton County, AR Accessory Structures: Shed & Carport Rules (2026)
Shed permit rules in Benton County, AR, also referred to as storage shed, backyard shed, or accessory building regulations, set size limits, setbacks, and when a building permit is required.
Key Facts
- No-fee threshold
- $1,000 or less in construction cost
- Fee above threshold
- $25 + $4/$1,000 up to $50k
- Enforcing office
- County Planning & Development Dept.
- Exempt structures
- Agricultural buildings only
- Max fine
- $500, or $250/day continuing
Summary
Benton County waives the building permit fee for any structure, including a shed, costing $1,000 or less to build, per the county's Sec. 54-4 fee schedule.
The fees for building permits required by the building code shall be determined by the total cost of construction in accordance with the following schedule except as provided in this section. The total cost of construction shall be determined by utilization of the ICC Building Valuation table dated August 2007 and attached hereto as an appendix and included as a part of this section. Total Cost of Construction Fee $1,000.00 or less No fee unless an inspection is required, in which case, the single phase of construction or miscellaneous inspection fee shall apply. $1,001.00 to $50,000.00 $25.00 for the first $1,000.00 plus $4.00 for each additional thousand or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $245.00 for the first $50,000.00 plus $3.00 for each additional thousand or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $445.00 for the first $100,000.00 plus $2.00 for each additional thousand or fraction thereof, to and including $500,000.00. $500,001.00 and up $1,245.00 for the first $500,000.00 plus $1.00 for each additional thousand or fraction thereof.
(b)The fees for the following items shall be as follows: (1)Re-inspection fee$ 50.00 (2)Plan review fee (required for only commercial or industrial buildings) 50.00 (3)House moving/manufactured home moving or set-up fee 100.00 (4)Single phase of construction or miscellaneous inspection fee, per inspection 50.00 (5)Lost permit fee 15.00
Full Breakdown
Sheds and other accessory structures fall under the county's general building permit fee schedule in Sec. 54-4, administered by the Planning and Development Department. Construction valued at $1,000 or less carries no permit fee unless the county requires an inspection, in which case the flat $50.00 miscellaneous inspection fee applies instead. Above $1,000, fees scale with the ICC Building Valuation table starting at $25.00 for the first $1,000 plus $4.00 per additional thousand. Only agricultural buildings (barns, hay/grain/livestock structures) are fully exempt from the permit process.
Violations & Fines
Building without a required permit is a misdemeanor punishable by a fine up to $500, doubled for repeat violations, plus up to $250 per day for a continuing violation.
Frequently Asked Questions
Do I need a permit for a small shed in Benton County?
Is a shed exempt from Benton County's building permit rules?
Sources & Official References
Other rules in Benton County
How Benton County compares: Shed Permit Requirements by City·Compare Benton County to another location·View the Arkansas accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.