Martin County, FL Accessory Structures: Shed & Carport Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Shed permit rules in Martin County, FL, also referred to as storage shed, backyard shed, or accessory building regulations, set size limits, setbacks, and when a building permit is required.

Key Facts

Size cap
250 sq ft floor area
Number allowed
One utility storage structure per lot
Timing
Cannot be built before house permits issue
Applies to
All zoning districts
Building permit
Still required from Building Division

Summary

Martin County caps a residential utility storage shed at 250 square feet of floor area in every zoning district under Land Development Regulations Sec. 3.201.C.1.a. The shed also cannot go up until the county has issued all permits for the main house it serves, per Sec. 3.201.B.1.

These county ordinances apply to unincorporated areas of Martin County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

3.201.B.1. With the exception of fences, walls and boat docks on lots zoned for single-family use, accessory uses and structures shall not be established on a lot prior to the issuance of all permits required for the development of the principal use to which it is accessory. ... 3.201.C.1.a. One utility storage structure, incidental to a permitted use, provided no such structure shall exceed 250 square feet in floor area.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 62 | Land Development Regulations: Supplement 62).

Full Breakdown

Sec. a permits 'one utility storage structure, incidental to a permitted use' in every zoning district in the county, but limits it to a single structure per lot and caps its floor area at 250 square feet; a second storage building, or one larger than 250 square feet, falls outside this accessory-use allowance and needs its own zoning review, most often as a garage or another listed accessory use with its own size standard. Because the shed is classified as an accessory structure, Sec. A requires it to be ancillary and incidental to the principal residence, located on the same lot (or a contiguous lot under common ownership or an HOA), and in the same zoning district as the house.

Sec. 1 then controls timing: with the narrow exception of fences, walls and boat docks on single-family lots, no accessory structure, including a shed, may be built on a lot before the county has issued all the permits required for the principal use, meaning the shed generally cannot go up ahead of or during construction of the house it serves. Sec. 2 further requires the shed to meet whatever zoning-district standards, such as setbacks, apply to the principal use unless a specific exemption applies. A shed still needs its own building permit from the Martin County Building Division for structural, electrical or plumbing work regardless of its size.

Violations & Fines

Building a utility shed larger than 250 square feet without separate zoning approval, erecting more than one such shed on a lot, or installing a shed before permits for the principal residence are issued violates Sec. 3.201.C.1.a and Sec. 3.201.B.1 and can draw a Martin County Growth Management stop-work order or code enforcement citation with fines through the special magistrate process.

Frequently Asked Questions

How big can my backyard shed be in Martin County?
Sec. 3.201.C.1.a limits a utility storage structure to 250 square feet of floor area, and only one such structure is allowed per lot as an accessory use; anything larger needs separate zoning review as something other than the standard utility storage accessory use, such as a garage with its own size standard.
Can I put up a shed before I build my house?
Generally no. Sec. 3.201.B.1 bars accessory structures, including sheds, from being established on a lot before all permits required for the principal use are issued, with a narrow exception only for fences, walls and boat docks on single-family lots.
Do I still need a permit for a shed under 250 square feet?
Yes. The 250-square-foot cap is a zoning limit, not a permit exemption; the county's Building Division still requires a building permit for the shed's structure, and any electrical or plumbing work needs its own permit.

Sources & Official References

Other rules in Martin County

All Martin County rules

How Martin County compares: Shed Permit Requirements by City·Florida rules heatmap·Compare Martin County to another location·View the Florida accessory structures overview

Get notified when Shed & Carport Rules in Martin County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.