South Jordan's Environmental Rules: The Rules That Matter

By CityRuleLookup Editorial Team

Every city handles environmental rules a little differently. In South Jordan, Utah, there are 4 distinct rules that residents and property owners should be aware of. Some are stricter than what neighboring cities enforce, and others are more relaxed. Here is what you need to know.

Erosion Control

South Jordan requires a land disturbance permit before any grading, and the application must include a civil-engineer-stamped grading plan and drainage plan meeting the city's design and construction standards.

Key details: Permit trigger: Any grading, excavation, or earthwork. Plan requirement: Engineer-stamped grading and drainage plans. Small-project exemption: Under 3,000 sq ft, minor cuts. Administered by: South Jordan City Engineer.

Grading or moving earth without a land disturbance permit blocks issuance of any building permit and is enforced by the City Engineer, who can deny approval if drainage or grading plans don't meet the LDDCS.

Flood Elevation Requirements

New and substantially improved residential structures in South Jordan's mapped flood hazard areas must have their lowest floor, including any basement, built at or above the FEMA base flood elevation before a permit issues.

Key details: Residential floor: at/above base flood elevation. Applies in: FEMA special flood hazard areas. Requires: development permit before construction. Local freeboard: none set beyond FEMA baseline.

Building below the required elevation, or without the floodplain development permit and elevation certificate section 13.24 requires, is presumed a violation until compliance documentation is provided to the city engineer.

Stormwater Management

South Jordan won't issue a building permit, subdivision approval, or other development permit unless the project includes drainage facilities adequate to carry away runoff, storm and flood water under the city's stormwater chapter.

Key details: No permit without: adequate drainage facilities. Design standard: control peak stormwater flow rates. Governed by: city's BMP manual. Developer posts: bond for facility installation.

No permit issues without approved drainage facilities and a posted bond; violating the stormwater chapter generally is a class B misdemeanor under section 13.12.140, with each day a separate offense.

Flood Zones

South Jordan participates in the National Flood Insurance Program (NFIP) and enforces floodplain development standards for properties in FEMA-designated Special Flood Hazard Areas (SFHA). Development in floodplains requires a floodplain development permit.

Key details: NFIP participation: Yes. Mapped zone: Jordan River and tributary SFHAs. Elevation required: 1 ft above BFE (freeboard). Permit: Floodplain development permit required in SFHA. Map lookup: FEMA MSC + city GIS.

The Bottom Line

South Jordan's environmental rules rules are a mixed bag. Some areas are strict, others are relaxed, and the details matter. The best approach is to check the specific rule that applies to your situation rather than assuming South Jordan is broadly strict or permissive.

Keep in mind that South Jordan can amend these rules at any council meeting. For the most current version of any rule mentioned here, check the specific ordinance page, where we track updates as they happen.