Skip to main content
CityRuleLookup

Buncombe County, NC Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required for
Construct, alter, repair, remove buildings
Small-job exemption
$5,000 or less, single-family/farm building
Exemption limits
Load-bearing, plumbing/HVAC/electrical, roofing excluded
Septic prerequisite
Board of Health approval where no sewer
Issuing office
Building inspector, Permits and Inspections
No-permit penalty
Late fee equal to permit fee

Summary

Unincorporated Buncombe County requires a written permit from the building inspector before constructing, altering, repairing or removing any building or structure. Work costing $5,000 or less on a single-family home or farm building is exempt, unless it touches load-bearing structure, plumbing, HVAC, electrical or non-code roofing materials.

These county ordinances apply to unincorporated areas of Buncombe County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Building permit. No person shall commence or proceed with the construction, reconstruction, alteration, repair or removal of any building or other structure, or any part thereof, without first securing a written permit therefor from the building inspector; provided, however, that no building permit shall be required for any construction, installation, repair, replacement or alteration costing $5,000.00 or less in any single-family residence or farm building unless the work involves the addition, repair or replacement of load-bearing structure; the addition or change in the design of plumbing, heating, air conditioning, electrical wiring, devices, appliances or equipment; the use of material not permitted by the state uniform residential building code; or the addition, excluding replacement of the like grade of fire resistance, of roofing.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 37).

Full Breakdown

Sec. 10-86(b) requires a written permit from the county building inspector before anyone commences or proceeds with the construction, reconstruction, alteration, repair or removal of any building or structure, or part of one, in the unincorporated county. 00 or less on a single-family residence or farm building needs no permit, but the exemption disappears the moment the job touches load-bearing structure, changes the design of plumbing, heating, air conditioning or electrical systems, uses material the state uniform residential building code doesn't allow, or adds new roofing rather than a like-for-like replacement.

Before any building permit can issue where the site isn't on city or county sewer, Sec. 10-86(a) requires county board of health approval of the septic tank and water supply. Applications go to the Department of Permits and Inspections on the department's forms under Sec. 10-90, with adequate plans and specifications under Sec. 10-91, and Sec. 10-93 lets the inspector issue the permit once the application, plans and fee are in order. Building without a permit still costs money: Sec. 10-87 and Sec. 10-99 add a late fee equal to the permit fee, and a refund on an unused permit is available for up to six months under Sec. 10-89, minus a service charge, disbursed by the finance department within 20 working days.

Violations & Fines

Constructing, altering or demolishing without the required permit adds a late fee equal to the regular permit fee under Sec. 10-87/10-99, on top of the permit fee itself once obtained. Unpermitted work that leaves a building unsafe can also be pursued separately under the county's Article IV unsafe-buildings process, up to an order to repair or demolish the structure.

Frequently Asked Questions

Do I need a permit for a small home repair in Buncombe County?
Not if the job costs $5,000 or less on a single-family home or farm building. But that exemption is lost the moment the work touches load-bearing structure, changes plumbing, HVAC or electrical design, uses non-code materials, or adds new roofing rather than a like-for-like replacement, under Sec. 10-86(b).
What has to happen before I can get a building permit if I'm not on county sewer?
Sec. 10-86(a) requires county board of health approval of the septic tank and potable water supply before the building inspector can issue any permit under this section, whenever the property can't connect to a city or county sewer line.
What happens if I build without a permit?
You still owe the original permit fee plus a late fee equal to that fee under Sec. 10-87 and Sec. 10-99, charged as an administrative surcharge. If the resulting structure becomes unsafe, the county can separately order repairs or demolition under the Article IV unsafe-buildings process.

Sources & Official References

Other rules in Buncombe County

All Buncombe County rules

Compare Buncombe County to another location·View the North Carolina building safety overview

Get notified when Building Permits in Buncombe County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.