Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Exempt work
Painting, tiling, cabinets, countertops
Cost threshold
$3,000 wholesale cost or less
Condition
No change in occupant/occupancy
Governing section
Code of Ordinances § 7-30(d)(1)(D)

Summary

In unincorporated DeKalb County, interior finish work -- painting, papering, tiling, carpeting, cabinets and countertops -- needs no permit if the wholesale cost is $3,000 or less and occupancy doesn't change.

These county ordinances apply to unincorporated areas of DeKalb County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(d)Work exempt from permit. Exemptions from the permit requirements of this section shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this chapter or any other laws or ordinances of the county. Permits shall not be required for the following:(1)Building:(A)Fences not over eight (8) feet (2440 mm) high.(B)Retaining walls which are not over four (4) feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or III-A liquids.(C)Water tanks supported directly upon grade if the capacity does not exceed five thousand (5,000) gallons (18,927 L) and the ratio of height to diameter or width does not exceed two (2) to one (1).(D)Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work for which the wholesale cost does not exceed three thousand dollars ($3,000.00), where there has been no change in occupant or occupancy.

Full Breakdown

Code of Ordinances § 7-30(a) requires a permit for alterations and repairs to a building, but § 7-30(d)(1)(D) exempts painting, papering, tiling, carpeting, cabinets, countertops and similar finish work where the wholesale cost is $3,000 or less and there is no change in occupant or occupancy. Cross the $3,000 threshold, change who occupies the space, or touch structural, plumbing, electrical, gas or mechanical systems, and the general permit requirement of § 7-30(a) applies, with permits due at least eight hours before work begins. This exemption governs unincorporated DeKalb County only; incorporated cities such as Dunwoody, Brookhaven, Tucker and Stonecrest set their own renovation permit rules.

Violations & Fines

Finish work exceeding $3,000 in wholesale cost or paired with an occupancy change without a permit is unpermitted construction, exposing the contractor or owner to a 100-percent penalty on the required permit fee.

Frequently Asked Questions

Do I need a permit to redo my kitchen cabinets in DeKalb County?
Not if the wholesale cost is $3,000 or less and you aren't changing the occupant or occupancy, under § 7-30(d)(1)(D); above that threshold, § 7-30(a)'s general permit requirement applies.
Does this exemption cover structural or electrical work?
No -- it covers only finish work like painting, tiling and cabinetry; any structural, plumbing, electrical, gas or mechanical change still needs a permit under § 7-30(a).

Sources & Official References

Other rules in DeKalb County

All DeKalb County rules

Compare DeKalb County to another location·View the Georgia building safety overview

Get notified when Building Permits in DeKalb County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.