Charleston County, SC Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Construct, enlarge, alter, repair, move, demolish
No-permit exemptions
Sheds ≤120 sq ft, fences ≤6 ft, more (§105.2)
Application abandoned
After 180 days without action (§105.3.2)
Permit expires
Unused 180 days after issuance (§105.5)
No permit before starting
Double fee (§108.4)
Penalty
Misdemeanor, each day separate offense (§115.1.1)
Enforcing office
Charleston County Building Official

Summary

Unincorporated Charleston County requires a permit from the Building Official before anyone constructs, enlarges, alters, repairs, moves, demolishes or changes the occupancy of a building or structure. Sec. 4-20 (§105.1) sets that baseline rule, with narrow exemptions for small accessory structures, fences and similar minor work under §105.2.

City-specific rules exist: Charleston, and North Charleston have their own building permits rules that differ from Charleston County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

105.1 Required Permits. Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by "this code", or to cause any such work to be done, shall first make application; to the Building Official and obtain the required permit. ... 105.2 Work exempt from permit... Building: 1.One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 120 square feet (11 m2).2.Fences not over 6 feet (1829 mm) high.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 21).

Full Breakdown

Sec. 2 treats an application as abandoned if it sits 180 days without action, unless the Building Official grants an extension of up to 90 days. 2 lists specific work that needs no permit at all: one-story detached accessory sheds, playhouses and similar structures up to 120 square feet; fences no taller than 6 feet; retaining walls no taller than 4 feet measured from footing to top unless they support a surcharge or impound hazardous liquids; above-ground swimming pools under 24 inches deep and 5,000 gallons; sidewalks and driveways no more than 30 inches above grade; and several other listed categories.

4 makes clear that a permit never authorizes work that otherwise violates the code. Starting work before the permit issues doubles the fee under Sec. 4).

Violations & Fines

Doing permit-required work without one, or beyond what's issued, is a misdemeanor under Sec. 4-30 (§115.1.1), with each day the violation continues a separate offense, and the Building Official or a damaged neighboring property owner may seek an injunction to stop it. Starting work before the permit is issued also doubles the permit fee under Sec. 4-23 (§108.4).

Frequently Asked Questions

Do I need a permit to build a shed in unincorporated Charleston County?
Only if it's larger than what §105.2 exempts. A one-story detached accessory shed, playhouse or similar structure up to 120 square feet needs no permit; anything bigger, or anything with plumbing or electrical service, falls back under the general Sec. 4-20 (§105.1) permit requirement.
Can I build a 6-foot fence without a permit?
Yes. Section 105.2 lists 'fences not over 6 feet high' among the work exempt from a building permit; a taller fence, or a wall that impounds hazardous liquids or supports a surcharge, loses that exemption.
How long do I have to start work after getting a building permit?
Under §105.5, the permit becomes invalid if work does not start within 180 days of issuance, or if started work is then suspended for 180 days; the Building Official can grant extensions of up to 180 days each on written request with justifiable cause.
What happens if I build without a permit in Charleston County?
It's a misdemeanor under Sec. 4-30 (§115.1.1), with each day the unpermitted work continues counted as a separate offense, and the Building Official or an affected neighboring property owner can go to court for an injunction to stop the work.

Sources & Official References

Other rules in Charleston County

All Charleston County rules

Compare Charleston County to another location·View the South Carolina building safety overview

Get notified when Building Permits in Charleston County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Cities Across Charleston County