Sumner County, TN Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit issuer
Director of Building Codes
Zoning compliance form
Required first, from Planning Director
Final step
Certificate of occupancy before use
Fee waiver
Discretionary, natural-disaster permits only
Appeal body
Board of Zoning Appeals

Summary

No building or structure in unincorporated Sumner County can be erected, moved, added to or structurally altered without a building permit issued by the Director of Building Codes, and no permit issues unless the Director confirms the plans comply with the Zoning Resolution and the adopted building code.

City-specific rules exist: Hendersonville has its own building permits rules that differ from Sumner County's county-level regulations. If you live in Hendersonville, check the city-specific page instead.

1. No building or other structure shall be erected, moved, added to or structurally altered without a building permit issued by the Director of Building Codes.

2. Except as hereinafter provided, no permit pertaining to the use of land or buildings shall be issued by any office, department, or employee of the county unless the application for such permit has been examined by the Director of Building Codes indicating that the proposed building or structure complies with all the provisions of this Resolution and the adopted building code.

3. Any building permit or certificate of occupancy issued in conflict with the provisions of this Resolution shall be null and void.

4. No land or building or part thereof, hereafter erected or altered in its use or structure shall be used until the building inspector shall have issued a certificate of occupancy stating that such land, building, or part thereof, and the proposed use thereof are found to be in conformity with the provisions of this resolution.

5. In cases of natural disaster, including but not limited to tornado; lightning strike; or flood or fire due to an act of nature; fees for the

Full Breakdown

' Before issuing that permit, the Director must examine the application and confirm the proposed building or structure complies with both the Zoning Resolution and the adopted building code; a permit or certificate of occupancy issued in conflict with the resolution is void. A layers on a separate, earlier step for most residential work: a zoning compliance form from the Planning Director, based on a concept plan showing the lot's shape and dimensions, the size and location of proposed and existing structures, and the intended use, including the number of dwelling units.

For lots of five acres or more, the Planning Director can set up a streamlined, expedited zoning compliance process. 4 adds a final checkpoint: the building can't be used until the building inspector issues a certificate of occupancy confirming the finished structure and its use conform to the resolution. 5 lets the Director waive building permit fees, at their discretion, when the permit follows a natural disaster such as a tornado, lightning strike, flood or fire caused by nature; anyone denied that waiver can appeal in writing to the Board of Zoning Appeals, which can overrule the Director's decision.

Violations & Fines

Building, moving or structurally altering a structure without the required permit, or occupying it before a certificate of occupancy issues, is a Section 1413.D misdemeanor, fined up to $50 per offense, with each day the unpermitted work or occupancy continues counted as a separate offense. Any permit issued in conflict with the resolution is automatically void, and the Director of Building & Codes investigates complaints describing an active violation no more than 30 days old.

Frequently Asked Questions

Do I need a permit to add onto my house in Sumner County?
Yes. Section 1408.B requires a building permit from the Director of Building Codes for any building erected, moved, added to or structurally altered, and the Director must confirm the plans comply with the Zoning Resolution and adopted building code first.
What has to happen before I get a building permit?
For most residential projects, you first need a zoning compliance form from the Planning Director based on a concept plan showing the lot, the proposed and existing structures, and the intended use, under Section 1408.A, before the Director of Building Codes will issue the building permit itself.
Can I move into a new house before it's inspected?
No. Section 1408.B.4 requires a certificate of occupancy from the building inspector confirming the finished building and its use conform to the resolution before the structure can be used.
Can building permit fees ever be waived?
Only after a natural disaster. Section 1408.B.5 lets the Director of Building Codes waive permit fees at their discretion for permits tied to damage from a tornado, lightning strike, or flood or fire caused by nature, and a denied applicant can appeal to the Board of Zoning Appeals.

Sources & Official References

Other rules in Sumner County

All Sumner County rules

Compare Sumner County to another location·View the Tennessee building safety overview

Get notified when Building Permits in Sumner County, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Cities Across Sumner County