Petaluma, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing adoption
PMC § 17.04.010, 2025 CA codes by reference
Permit fees
Set by city council resolution, not state tables
Shed exemption
One-story, ≤120 sq ft, no wiring/plumbing
Stop-work fee
1x to 5x the permit fee
Misdemeanor penalty
Up to $1,000 fine and/or 6 months jail
Appeal body
Building board of appeals, Chapter 17.08

Summary

Petaluma adopts the 2025 California Building and Residential Codes by reference, so nearly all new construction, additions and alterations need a city-issued building permit before work starts. The city sets its own permit fees by council resolution instead of using the state code's fee tables, and it carves out a narrow exemption for very small detached sheds.

All references to permit fees in the codes adopted by reference are deleted pursuant to the ordinance codified in this section. Instead, the permit fees applicable in Petaluma will be fixed by the fee schedules adopted by the city council by resolution. ... Section 105.2, Item Building: 1, is hereby amended to read as follows:105.2 Item Building: 1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area is not greater than one hundred twenty square feet (120 sq.) (11 m2), there are no wall finishes such as, but not limited to, gypsum wallboard, plaster, stucco, or paneling placed on any interior surface of any wall and/or partition, and no electrical, mechanical or plumbing systems are contained within the structure. These structures are still regulated by Section 710A, despite exemption from permit.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2931 NCS, passed July 6, 2026).

Full Breakdown

2 of the California Government Code," and strips out the state code's own permit-fee references, substituting fee schedules the city council adopts by resolution. 2 to exempt only one-story detached accessory structures used as tool sheds, playhouses and similar uses that are no larger than 120 square feet, have no interior wall finishes such as gypsum wallboard, plaster, stucco or paneling, and contain no electrical, mechanical or plumbing systems; even these sheds remain regulated by Section 710A. Everything else, from a room addition to a new deck exceeding minor thresholds, needs a permit application reviewed by the building official.

2, which must be posted at the site and requires work to cease immediately until the cited conditions are resolved. 08; an appeal must be filed in writing at least ten days before the board considers it and must identify the specific code provision at issue.

Violations & Fines

A stop-work order carries an additional investigation fee of at least the permit fee and up to five times the permit fee, with licensed contractors and repeat offenders automatically assessed the five-times rate. Separately, violating any provision of Chapter 17.04, including working without a required permit, is a misdemeanor punishable by a fine of up to $1,000 and/or up to six months in jail, with each day of continued violation counted as a separate offense. The city can also pursue nuisance abatement or administrative citations under Chapters 1.13, 1.14 and 1.16.

Frequently Asked Questions

Do I need a permit to build a small storage shed in Petaluma?
Only if it exceeds the exemption. Section 17.04.020 exempts one-story detached sheds and playhouses no larger than 120 square feet with no interior wall finishes and no electrical, mechanical or plumbing systems. Anything larger, wired, plumbed, or finished inside still needs a building permit.
What happens if I build without a permit in Petaluma?
The building official can issue a written stop-work order requiring work to cease immediately, and add an investigation fee of one to five times the normal permit fee. The underlying violation is also a misdemeanor carrying up to a $1,000 fine and up to six months in jail, with each day treated separately.
Who decides building permit appeals in Petaluma?
The building board of appeals, created under Chapter 17.08, hears appeals of the building official's orders and determinations. The appeal must be filed in writing at least ten days before the board meets to consider it, and must specify the code provision and the nature of the dispute.

Sources & Official References

Other rules in Petaluma

All Petaluma rules

California rules heatmap·Compare Petaluma to another location·View the California building safety overview

Get notified when Building Permits in Petaluma, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.