Skip to main content
CityRuleLookup

Santa Maria, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Current code edition
2025 CBC, effective 1/1/2026
Permit validity
365 days from issuance
Extension available
Up to 180 days per extension
SMIP fee
0.013% residential / 0.028% non-residential valuation
Withdrawn-application refund
Up to 80% if before plan review
Unpermitted work
Misdemeanor, each day a separate offense

Summary

Santa Maria enforces the 2025 California Building Code and requires a City permit before constructing, altering or repairing a building, and even before paving, restriping or re-signing parking lots and structures. The Building Official issues permits under Chapter 9-04, which expire 365 days after issuance unless extended.

Building permits shall be required for all paving, repaving, resurfacing or slurry, striping, re-striping and signage or re-signage of parking spaces in parking lots and structures in both publicly and privately funded public, commercial, or common use facilities.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4818069; v9 updated 2026-04-07).

Full Breakdown

010 adopts the California Building Code, 2025 Edition, by reference, effective January 1, 2026 under Ordinance 2025-05, replacing the 2022 edition adopted by Ordinance 2022-06. 1 to add: 'Building permits shall be required for all paving, repaving, resurfacing or slurry, striping, re-striping and signage or re-signage of parking spaces in parking lots and structures in both publicly and privately funded public, commercial, or common use facilities,' extending the permit requirement beyond new buildings to parking lot resurfacing and striping work. 030. 040. 080 lets an applicant appeal a Building Official decision to the Board of Appeals for a fee set in the City's fee schedule. 070.

Violations & Fines

Section 9-04.090 amends CBC 114.4 to make it unlawful to erect, construct, enlarge, alter, repair, move, convert, demolish, or occupy any building or structure in violation of the Code. A conviction is a misdemeanor punishable by the fine and imprisonment set out in Title 1, Chapter 6 of the Municipal Code, and each day a violation continues is a separate offense.

Frequently Asked Questions

Do I need a permit to restripe a parking lot in Santa Maria?
Yes. Section 9-04.020 specifically adds paving, repaving, resurfacing, striping, re-striping and signage or re-signage of parking spaces to the buildings and structures that require a City permit, whether the lot is public, commercial or privately funded common-use property.
How long is a Santa Maria building permit good for?
365 days from the date it's issued. Section 9-04.030 lets the Building Official grant one or more extensions of up to 180 days each, but you must request the extension in writing and show justifiable cause before the permit lapses, so file it well before the deadline passes.
What happens if I start construction without a permit in Santa Maria?
It's a misdemeanor under Section 9-04.090, punishable by fine and imprisonment under Title 1, Chapter 6, with each day of continued work a separate offense. The Building Official can also charge a special investigation fee, up to the normal permit fee amount, before issuing a late permit.

Sources & Official References

Other rules in Santa Maria

All Santa Maria rules

California rules heatmap·Compare Santa Maria to another location·View the California building safety overview

Get notified when Building Permits in Santa Maria, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.