Dwelling permit fee
$0.17/sq ft, $50 minimum
Accessory structure fee
$0.14/sq ft, $50 minimum
Permit voids if unstarted
within 1 year of issuance
Completion deadline
2 years from issuance
Unpermitted-start surcharge
50% of permit fee
General violation fine
$100 per day (§151.99)

Summary

Tippecanoe County requires a permit before beginning construction, demolition, or alteration of any building or structure in the unincorporated county. The Building Commissioner issues the permit, checks the project against the Unified Zoning Ordinance first, and collects fees set in the fee schedule at County Code § 151A.04.

These county ordinances apply to unincorporated areas of Tippecanoe County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A) Permit required. A permit shall be obtained before beginning construction, demolition or alteration of any building or structure, using forms furnished by the Building Commissioner. All permits shall be issued by the Building Commissioner, and all fees provided for herein shall be paid to the county.

(1) A building permit expires and becomes void if:

(a) The work authorized by the permit is not started within one year from the date of issuance;

(b) The work authorized by the permit is suspended or abandoned for one year;

(c) The work authorized by the permit is not completed within two years from the date of issuance.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-17: Supplement contains: Local legislation current through Ord. 2025-25-CM, passed 8-1-25; and State legislation current through 2025 Acts, Pamphlet No. 3).

Full Breakdown

07(A), a permit must be obtained before construction, demolition, or alteration begins, using forms furnished by the Building Commissioner, and all fees go to the county. A permit expires and becomes void if work is not started within one year of issuance, is suspended or abandoned for one year, or is not completed within two years of issuance; the Building Commissioner may grant extensions if the request is filed before expiration. Permits issued before September 1, 1999 expired 90 days after September 1, 2005. 07(C) requires the project be checked for compliance with the Unified Zoning Ordinance of Tippecanoe County, and it may also need a site plan approved by the County Surveyor, a driveway permit or letter from the County Highway Engineer, or a septic permit or letter from the County Board of Health.

14 per square foot (minimum $50) for detached garages, pole barns, yard barns, swimming pools, grain bins, and decks. Demolition permits cost $75 and land fill permits cost $150. 04 exempts storage buildings of 120 square feet or less that are not on a masonry or concrete foundation, and fences, mobile structures, and certified industrialized buildings, from the subchapter entirely.

Violations & Fines

Building without the required permit triggers a 50% surcharge on the permit fee under § 151A.04(H), calculated from the day the first building element is put in place. Beyond that, § 151.99 makes any violation of §§ 151.01 through 151.17 punishable by a $100 fine, with each day of continuing unlawful activity charged as a separate offense.

Frequently Asked Questions

Who issues building permits in Tippecanoe County?
The County Building Commissioner issues all building permits for the unincorporated county under § 151.07(A), using application forms the Commissioner furnishes, and collects the fees set out in the § 151A.04 fee schedule before work can start.
How long does a Tippecanoe County building permit stay valid?
A permit voids itself if the authorized work is not started within one year of issuance, is suspended or abandoned for a year, or is not finished within two years of issuance, per § 151.07(A)(1). The Building Commissioner can grant an extension if it is requested before the permit expires.
What happens if I start building before getting a permit?
Section 151A.04(H) allows the county to add a surcharge equal to 50% of the normal permit fee once construction has started without a permit on file, counted from the moment the first building element is put in place.
Does the county check zoning before issuing a building permit?
Yes. Section 151.07(C) requires every project to be checked for compliance with the Unified Zoning Ordinance of Tippecanoe County before a building permit is issued, and some projects also need site plan, driveway, or septic approvals from other county offices.

Sources & Official References

Other rules in Tippecanoe County

All Tippecanoe County rules

Compare Tippecanoe County to another location·View the Indiana building safety overview

Get notified when Building Permits in Tippecanoe County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.