Boone County, KY Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Annual permit fee
$25 per year
Issuing office
Boone County Building Department
Code standard
National Electrical Code
Certificate deadline
3 days to Building Dept (§150.79)
Max penalty
$250 fine or 90 days jail
Applies to
Unincorporated Boone County only

Summary

Unincorporated Boone County, Kentucky requires an annual electrical permit, $25 per year, from the Boone County Building Department before any wiring installation, addition, alteration, repair, relocation or removal, per Code § 150.83. A licensed county Electrical Inspector must certify the work meets National Electrical Code standards and issue a certificate of approval before service is connected. Florence, Union and Walton enforce separate municipal rules.

These county ordinances apply to unincorporated areas of Boone County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A) A certification of approval shall be obtained from a duly qualified Electrical Inspector for all work covered by any electrical permit or for any electrical work that is done within the County. Before a certification of approval is issued by an Electrical Inspector, the electrical work must meet the minimum standards of the National Electrical Code or other appropriate codes and ordinances as adopted by the Fiscal Court. (B) One copy of the certification shall be provided to the County Building Department by the Electrical Inspector within ten days after issuance.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-28: Supplement contains: Local legislation current through Ordinance 2025-20, passed 6-17-25; and State legislation current through KRS 2025).

Full Breakdown

Boone County's own Building Regulations chapter sets electrical permitting for the unincorporated county. 78, anyone doing electrical work, whether an electrical contractor, electrician, master electrician or owner-occupant, must obtain a certification of approval from a licensed county Electrical Inspector, and that work must first meet the minimum standards of the National Electrical Code or other codes and ordinances the Fiscal Court has adopted. One copy of that certification goes to the County Building Department within ten days of issuance. 83 sets the fee: an electrical permit runs $25 per year, obtained from the Boone County Building Department, and covers installation, addition, alteration, repair, relocation or removal of electrical wiring.

79, no electric, light or power company may connect or furnish current to any electrical installation in the county until the installation has been inspected and approved by an Electrical Inspector and a certificate of approval issued; that certificate must reach the Building Department within three days. 76(C), they must stay with that same inspector through completion of the job, and concealing wiring before inspection is prohibited. 80(B). These rules bind only the unincorporated parts of Boone County; Florence, Union and Walton administer electrical permitting under their own municipal codes.

Violations & Fines

Violating any provision of Chapter 150, including working without the required electrical permit or certificate of approval, is a misdemeanor under § 150.99: a fine of not less than $25 nor more than $250, up to 90 days in jail, or both, with each day of continued violation charged as a separate offense. Electricians who ignore the rules also risk county revocation of their occupational license under §§ 150.77 and 150.80.

Frequently Asked Questions

Does Boone County require a permit for electrical work?
Yes. Boone County Code § 150.83 requires an electrical permit from the county Building Department, priced at $25 per year, before any installation, addition, alteration, repair, relocation or removal of electrical wiring in the unincorporated county.
Who inspects electrical work in Boone County?
A county-licensed Electrical Inspector, chosen by the property owner or contractor under § 150.76(C). The inspector must confirm the work meets National Electrical Code standards before issuing a certificate of approval under § 150.78.
What happens if I skip the electrical permit?
You are guilty of a misdemeanor under § 150.99, punishable by a fine between $25 and $250, up to 90 days in jail, or both, with each day of the violation counted as a separate offense.
Does this apply inside Florence or Union?
No. Boone County's Chapter 150 governs only the unincorporated county; Florence, Union and Walton each enforce their own electrical permitting rules under their own municipal codes.

Sources & Official References

Other rules in Boone County

All Boone County rules

Compare Boone County to another location·View the Kentucky building safety overview

Get notified when Electrical Permits in Boone County, KY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.