Key Facts

Adopted code
2022 California Electrical Code (Part 3, Title 24)
Permit fee
Per City Council fee schedule, one fee per permit
One-family service
Not less than 200 amperes, 225 ampere bus
Aluminum conductors
Prohibited smaller than size 1/0 AWG
Authority Having Jurisdiction
Chief Building Official and designees
Infraction fine cap
$100 for a first violation

Summary

Cathedral City adopts the 2022 California Electrical Code, based on the 2020 National Electrical Code, in Chapter 8.14. A fee is paid for each electrical permit under the fee schedule adopted by the City Council, and permit administration follows Section 89.108.4. A one-family dwelling service must be rated not less than 200 amperes.

9. Section 80.19 is amended to read as follows: 80.19 Permits. The administration of permits under this Electrical Code shall be governed by Section 89.108.4 of the General Code Provisions of this Electrical Code. 1 ... 5. Section 80.37 is added to provide for fees: 80.37 Fees. (A) Payment of fees. On buildings, structures, and electrical systems or alterations requiring a permit under this Electrical Code, a fee for each permit shall be paid as required, in accordance with the fee schedule adopted by the City Council, a copy of which is on file with the Building and Safety Division. (B) Fee refunds. The Chief Building Official is authorized to establish a fee refund policy. 16. Section 80.39 is added to provide for inspections: 80.39 Inspections. The administration of inspections under this code shall be governed by subsection 89.108.4.4 of the General Code Provisions of this Electrical Code.

Full Breakdown

Chapter 8.14 adopts the California Electrical Code, 2022 Edition, as the Electrical Code for the city of Cathedral City. It is published as Part 3 of Title 24 and based on the 2020 National Electrical Code. Under § 8.14.010 it governs the design, construction, reconstruction, installation, quality of materials, location, operation, and maintenance or use of electrical equipment, wiring and systems, as well as the issuance of permits and the collection of permit fees.

Permit administration is set in § 8.14.030, which adopts Annex H with changes. Section 80.19 says the administration of permits is governed by Section 89.108.4 of the General Code Provisions. Section 80.37 requires that, on buildings, structures and electrical systems or alterations requiring a permit, a fee for each permit be paid in accordance with the fee schedule adopted by the City Council, and it authorizes the Chief Building Official to establish a fee refund policy. Section 80.39 sends inspections to subsection 89.108.4.4. Section 80.2 names the City's Chief Building Official and designees as the Authority Having Jurisdiction, and Section 80.13 establishes the Building and Safety Division under that official's control. A written application with a fee established by the City Council is required for a proposed alternate material or method of construction.

Section 8.14.020 adds two technical rules. For a one-family dwelling, the service disconnecting means must have a rating of not less than 200 amperes, 3-wire, with a minimum 225 ampere bus. The use of aluminum and copper-clad aluminum conductors, feeder conductors, branch circuit conductors and taps or service entrance cables smaller than size 1/0 AWG is expressly prohibited.

Building Code Section 105.8 in § 8.04.020 says permits for electrical, mechanical, or plumbing work, on other than R-3 and associated U occupancies, shall only be issued to California licensed contractors. Appeals go to the electrical board, which is the Board of Appeals under Section 113 of the Building Code and has no authority to waive requirements of the code.

Violations & Fines

Section 80.23 makes it unlawful to erect, construct, alter, extend, repair, move, remove, demolish or occupy any building, structure or equipment in violation of the Electrical Code or a permit. A violation is an infraction under Chapter 13.65, with fines capped at one hundred dollars for a first violation, two hundred dollars for a second within twelve months, and five hundred dollars for a third. Public nuisance conditions can be abated under Chapter 13.80.

Frequently Asked Questions

How much does an electrical permit cost in Cathedral City?
The code prints no dollar figure. Section 80.37, added in § 8.14.030, says a fee for each permit shall be paid as required, in accordance with the fee schedule adopted by the City Council, a copy of which is on file with the Building and Safety Division. The Chief Building Official is also authorized to establish a fee refund policy.
What is the minimum electrical service size for a house in Cathedral City?
Section 230.79(C), as amended in § 8.14.020, says that for a one-family dwelling the service disconnecting means shall have a rating of not less than 200 amperes, 3-wire, with a minimum 225 ampere bus. This is a local requirement written into the Cathedral City Municipal Code, so a smaller service does not meet it.
Can I use aluminum wiring in Cathedral City?
Section 310.3(E) expressly prohibits the use of aluminum and copper-clad aluminum conductors, feeder conductors, branch circuit conductors and taps or service entrance cables smaller than size 1/0 AWG. The prohibition is for general wiring, and it appears in § 8.14.020 as an amendment to the 2022 California Electrical Code.
Who inspects and decides electrical code questions?
The City's Chief Building Official and designees are the Authority Having Jurisdiction under Section 80.2, working through the Building and Safety Division. Section 80.39 governs inspections through subsection 89.108.4.4. Appeals are heard by the Board of Appeals under Building Code Section 113, which cannot waive requirements of the Electrical Code.

Sources & Official References

Other rules in Cathedral City

All Cathedral City rules

California rules heatmap·Compare Cathedral City to another location·View the California building safety overview

Get notified when Electrical Permits in Cathedral City, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Riverside County handle electrical permits.

Corona, CA
Some Restrictions
Menifee, CA
Some Restrictions
Moreno Valley, CA
Some Restrictions
Murrieta, CA
Some Restrictions
Palm Springs, CA
Some Restrictions
Riverside, CA
Some Restrictions
Temecula, CA
Some Restrictions