Key Facts

Adopted code
2025 California Electrical Code, Part 3
Adopting section
§ 26-1
Permit expiration
1 year from issuance (§ 26-3.1(c))
Renewal window
30 days after expiration
Local exemption
Agricultural water pumps need no permit
General penalty
Up to $1,000 fine / 6 months jail

Summary

Butte County adopts Part 3 of Title 24, the California Electrical Code, by reference as its electrical code under Section 26-1. Electrical permits run on the same one-year expiration and renewal clock as building permits under Section 26-3.1(c), and the Building Official amended the code to exempt agricultural water pumps used solely for agricultural purposes from needing an electrical permit at all.

City-specific rules exist: Chico has its own electrical permits rules that differ from Butte County's county-level regulations. If you live in Chico, check the city-specific page instead.

Part 3 California Electrical Code. ... The 2025 California Building Standards Code parts and appendices listed above are hereby declared to be the building code for Butte County and shall apply to and govern all building construction in the unincorporated areas of the county... "Electrical", "4" is added as follows: No permits shall be required for the installation, alteration or repair of agricultural water pumps used solely for agricultural purposes.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 61).

Full Breakdown

Butte County no longer keeps a standalone electrical code chapter; the editor's note to Chapter 27 (Electricity) records that the former chapter "was repealed and replaced by Ord. No. 3973, § 8, 12-11-07," with its substance folded into Chapter 26 (Buildings). Section 26-1 adopts the 2025 edition of the California Building Standards Code by reference, and its table lists "Part 3, California Electrical Code" alongside the Building, Residential, Mechanical, and Plumbing codes as part of that adoption, applying "to and govern all building construction in the unincorporated areas of the county."

Section 26-3.1(c) then ties electrical permits to the same administrative rules the county wrote for building permits: "The following provision shall apply to permits under the 2025 California Residential Code, 2025 California Electrical Code, 2025 California Mechanical Code, and 2025 California Plumbing Code: The rules concerning time limitation of application, expiration, transferability, occupancy, and work exempt from a permit shall be as specified in subsection (a) above." That cross-reference means an electrical permit application expires one year after filing if the permit is not issued (Section 105.3.2), an issued permit expires one year from issuance with a 30-day window to renew before a new application and fees are required (Section 105.5), and a permit can be transferred to a new owner or contractor (Section 105.8). Section 26-3.1(a) also adds a Butte-specific exemption directly to the "Electrical" work-exempt list: "No permits shall be required for the installation, alteration or repair of agricultural water pumps used solely for agricultural purposes."

Violations & Fines

Electrical work performed without a permit, or a permit allowed to expire without renewal, is a code violation the Building Official can pursue as a Building Standards Code matter. Chapter 41 (Code Enforcement Policies and Procedures) governs abatement. Where the Code does not set a specific penalty, Section 1-7 applies a general fine of up to one thousand dollars, up to six months in jail, or both, with each day of a continuing violation charged as a separate offense.

Frequently Asked Questions

Does every electrical job in Butte County need a permit?
No, with one exception. Section 26-3.1(a) added "Electrical, 4" to the work-exempt list, which states: "No permits shall be required for the installation, alteration or repair of agricultural water pumps used solely for agricultural purposes." Every other electrical installation, alteration, or repair needs a permit under the adopted California Electrical Code.
How long is a Butte County electrical permit valid?
One year from the date it is issued. Section 26-3.1(a) amends Section 105.5 to state every permit "shall expire by limitation and become null and void after one (1) year from the date of issuance," though a renewal permit can be applied for within 30 days of that expiration if no plan changes were made.
Does Butte County have its own electrical code?
Butte County did not write its own electrical code. Section 26-1 adopts "Part 3, California Electrical Code" of the 2025 California Building Standards Code by reference, and Section 26-3.1(c) applies the county's building-permit rules on expiration, renewal, transferability, and exemptions to electrical permits as well.

Sources & Official References

Other rules in Butte County

All Butte County rules

California rules heatmap·Compare Butte County to another location·View the California building safety overview

Get notified when Electrical Permits in Butte County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Cities Across Butte County