Horry County, SC Building Safety: Electrical Permits (2026)
Key Facts
- Minimum permit fee
- $100 per power service application
- Covers
- New service, change of service, water pumps, fences
- Reinspection fee after 2 visits
- $25 minimum per visit
- Failed/unready inspection fee
- $100 minimum per visit
- Adopted code
- National Electrical Code, Section 6-2
Summary
Horry County charges a minimum $100 permit fee for any power service application, new service or change of service, including water pumps and electric fences. Reinspections after two visits cost at least $25 each, rising to $100 when work isn't ready or was faulty.
(a)The minimum permit fee for power service applications, new or change of service for any purpose, to include water pumps and electric fences, shall be one hundred dollars ($100.00).(b)The minimum reinspect fee shall not be less than twenty-five dollars ($25.00) per visit after two (2) inspection visits. The minimum reinspect fee shall not be less than one hundred dollars ($100.00) for work not ready for inspection when called, repairs or corrections not made when inspections are called, and condemned work resulting from faulty work.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 88).
Full Breakdown
Section 6-32 of the Horry County Code sets the floor for electrical permitting outside the county's municipalities. Any power service application, whether it's a new electrical service or a change of an existing one, carries a minimum permit fee of $100, and that minimum expressly extends to installations such as water pumps and electric fences, not just houses. The section also prices reinspections: after a contractor has already used two inspection visits, every additional visit costs at least $25. If an inspector arrives and the work isn't ready for inspection, if required repairs or corrections weren't made when the inspection was called, or if the inspector condemns faulty work, the reinspection fee jumps to a minimum of $100 per visit.
These fees sit alongside the county's broader adoption of the National Electrical Code under Section 6-2, which the building inspection department (Section 6-1) enforces for all construction outside Myrtle Beach, North Myrtle Beach, Conway and the county's other municipalities. In fast-growing unincorporated areas like Carolina Forest and Little River, where there is no city hall to permit through, every service upgrade, whether it's a new panel, a well pump, or an electric fence around a pasture, needs this county electrical permit before an electrician energizes the circuit.
Violations & Fines
Working without the required electrical permit, or calling an inspection before the work is actually ready, triggers the escalated reinspection fees under Section 6-32: at least $25 per visit after the first two, or a minimum $100 charge specifically for no-shows, uncorrected repairs, or condemned faulty work. Unpermitted electrical work more broadly falls under the general Code Section 1-8 penalty referenced in the technical-code adoption ordinance.
Frequently Asked Questions
How much does an electrical permit cost in Horry County?
What if the inspector shows up and the work isn't ready?
Does Horry County follow the National Electrical Code?
Sources & Official References
Other rules in Horry County
Compare Horry County to another location·View the South Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.