Yolo County, CA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2019 California Electrical Code
- Governing section
- Yolo County Code § 7-1.02(c)
- Administrative rules
- Same as CBC, Sec. 7-1.03
- Permit issuer
- Chief Building Official
- Permit expires
- 12 months if work not started
- Appeal deadline
- 30 days to Planning Commission
- Max penalty
- $500 fine and/or 6 months jail per day
Summary
Yolo County requires an electrical permit for wiring work in the unincorporated area by adopting the 2019 California Electrical Code under Sec. 7-1.02(c), administered through the same permit, fee, and appeal process the county built into its building code in Sec. 7-1.03 and 7-1.04.
The 2019 California Electrical Code including Annex Chapters: A- Product Safety Standards, B-Application Information for Ampacity Calculation, C-Conduit and Tubing Fill Tables for Conductors and Fixture Wires of the Same Size, D-Examples, F-Availability and Reliability for Critical Operations Power Systems; and Development and Implementation of Functional Performance Tests (FPTs) for Critical Operations Power Systems, and G-Supervisory Control and Data Acquisition (SCADA), as published in Title 24, Part 3 of the California Code of Regulations as amended in Section 7-1.06.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-21: Supplement 2026 S-21 includes: Local legislation current through Ord. 1584, effective June 25, 2026).
Full Breakdown
Sec. " Sec. 03," meaning electrical permits run through the same Chief Building Official process as any other Title 7 permit. 2, "in accordance with the current fee schedule as adopted by the Board of Supervisors" (Sec. 04(a)(5)), with electrical fees calculated as a percentage of the building permit fee. 5 (Sec. 04(a)(4)); reviving an expired permit costs half the original fee. 1 (Sec. 04(a)(6)) requires an investigation fee equal to the permit fee. 4 (Sec. 04(a)(10)).
Violations & Fines
Performing electrical work without the required permit is a misdemeanor under Sec. 1-2.01, punishable by a fine of up to $500, up to six months in county jail, or both, with each day of continued unpermitted work treated as a separate offense, in addition to the Section 109.4.1 investigation fee charged before a permit can be issued.
Frequently Asked Questions
What electrical code applies to unincorporated Yolo County?
Who issues electrical permits in Yolo County?
How long is an electrical permit good for?
What if I do electrical work without a permit?
Sources & Official References
Other rules in Yolo County
California rules heatmap·Compare Yolo County to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.