Skip to main content
CityRuleLookup

Solano County, CA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted electrical code
California Electrical Code, 2025 Edition
Commercial conductor rule
Rigid conduit, EMT, or approved flex/PVC
Service panel minimum
200 amps for homes over 1,500 sq ft
EV charger permits
Expedited, nondiscretionary under Sec. 6.3-26

Summary

Solano County enforces the 2025 California Electrical Code for all wiring work, adopted by reference in Chapter 6.3, and layers on two local amendments: commercial buildings must run conductors in rigid conduit, EMT, or approved flex/PVC, and new houses over 1,500 square feet need at least a 200-amp main service panel.

City-specific rules exist: Vacaville, Vallejo, and Fairfield have their own electrical permits rules that differ from Solano County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

California Electrical Code Section 230.79(C) is amended to add: All new single family dwellings in excess of fifteen hundred square feet of living area will be equipped with minimum two hundred amp main service panels. ... 6.3-22 Commercial buildings--conduit required: All electrical conductors in commercial buildings or structures shall be in rigid conduit, EMT or where permitted flex or PVC.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 1868, passed April 9, 2026).

Full Breakdown

Sec. 3-03(a)(4) adopts "The California Electrical Code, 2025 Edition, and the administrative regulations for the 2025 Edition and the nonbuilding regulations published by the National Fire Protection Association and the International Code Council" as part of the county's building code. 3: applications must be signed by the owner or a licensed contractor, engineer, architect, or authorized agent (Sec. 3-12), and, for structures in Occupancy Groups A, B, E, F, H, I, L, M, R-1, and S, must be professionally designed (Sec. 3-13). The county adds two specific local amendments on top of the adopted code.

Sec. 3-22 requires that "All electrical conductors in commercial buildings or structures shall be in rigid conduit, EMT or where permitted flex or PVC," a stricter wiring-method rule than a bare NEC adoption alone would impose. Sec. 79(C) to require that "All new single family dwellings in excess of fifteen hundred square feet of living area will be equipped with minimum two hundred amp main service panels," ensuring larger homes have adequate service capacity for modern electrical loads including EV chargers and heat pumps. Separately, Sec.

3-26 provides an expedited electrical permitting track specifically for electric vehicle charging stations, requiring documents be posted online, electronic submittal be available, and nondiscretionary permit issuance for complete applications that meet the county's checklist, unless the Building Official finds substantial evidence of a specific adverse safety impact.

Violations & Fines

Performing electrical work without a required permit, or in violation of the adopted California Electrical Code or the county's conduit and service-panel amendments, is an infraction under Sec. 6.3-09(a) and (e), with each additional day of noncompliance after citation treated as an additional violation. Sec. 6.3-09(f) makes the responsible party liable for the county's costs of correction, abatement, and prosecution, and the Building Official and deputies may issue citations under Sec. 6.3-09(d) and Penal Code Section 836.5 (Sec. 6.3-10(a)).

Frequently Asked Questions

What electrical code does Solano County enforce?
The 2025 edition of the California Electrical Code, adopted by reference under Sec. 6.3-03(a)(4), governs all electrical permit work in the unincorporated county, along with two local amendments on commercial conduit and residential service panels.
What size electrical service panel do I need for a new house in Solano County?
If the home exceeds 1,500 square feet of living area, Sec. 6.3-23 requires a minimum 200-amp main service panel, amending California Electrical Code Section 230.79(C).
Are exposed electrical conductors allowed in commercial buildings?
No. Sec. 6.3-22 requires all electrical conductors in commercial buildings or structures to be run in rigid conduit, EMT, or, where permitted, flex or PVC conduit.
Is there a faster permit process for an EV charging station?
Yes. Sec. 6.3-26 sets up an expedited, streamlined electrical permitting process for EV charging stations, with online document access, electronic submittal, and nondiscretionary issuance once an application meets the Building Official's checklist.

Sources & Official References

Other rules in Solano County

All Solano County rules

California rules heatmap·Compare Solano County to another location·View the California building safety overview

Get notified when Electrical Permits in Solano County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Cities Across Solano County