Key Facts

Adopted code
2025 CA Electrical Code (2023 NEC base)
Submittal required
Load calcs, wiring diagrams at application
Enforcement tool
Building Official may disconnect power
UFER ground
Must be accessible via cover/access panel
Temporary power
Only during active construction permit

Summary

Vacaville enforces the 2025 California Electrical Code, based on the 2023 National Electrical Code, under Municipal Code Section 15.20.256.010. Local amendments require full construction documents, including bonding, grounding, and load calculations, at the time of permit application, and let the Building Official disconnect power from any building found dangerous.

Adopt the California Electrical Code (CEC), 2025 Edition, based on the 2023 National Electrical Code as published by the National Fire Protection Association (NFPA) and as adopted by the State Building Standards Commission in the California Code of Regulations, Title 24, Part 3. ... Article 89.108.4.3 – Plan review and time limitations is amended by adding the following: Submittal Documents. Construction documents for electrical work shall be provided at the time of the permit application or at any time, as determined by the Building Official. Such documents shall include, but not be limited to, bonding and grounding details; wiring plan runs and details, single line diagrams, load calculations, wire sizing calculations, conduit sizing calculations, and derating calculations.

Full Breakdown

The city adopted the CEC, 2025 Edition, as published by NFPA and adopted by the State Building Standards Commission, under Section 15.20.256.010, folding it into Title 24, Part 3 of the California Code of Regulations. Section 15.20.256.020 layers city-specific amendments onto that base code. Article 89.108.4.3 is amended so that construction documents for electrical work, covering bonding and grounding details, wiring plan runs, single-line diagrams, load calculations, wire sizing calculations, conduit sizing calculations, and derating calculations, must be submitted at the time of the permit application or whenever the Building Official later requires them.

Article 89.108.9 gives the Building Official authority to withhold or disconnect electrical power from any building the code defines as dangerous, or that presents another hazardous condition, independent of any separate abatement action. A newly added Article 250.52(A)(3)(3) requires a concrete-encased grounding electrode (a UFER ground) on new single-family dwellings to be accessible, either through an interior cover plate or an exterior weatherproof access panel positioned next to the electrode. Section 590.1 is amended so temporary electrical service can be authorized only during an active construction or repair permit, or where conditions of approval specifically allow temporary power.

Appeals of electrical permit decisions go to the same building appeals board structure used for the rest of Title 15: Section 15.20.250.100 adds subsection 89.108.8.3 to the CEC establishing a local appeals board mirroring the five-member Napa-Solano ICC panel.

Violations & Fines

Electrical work performed without a permit, or with the required submittal documents missing, exposes an owner to the Building Official's authority to withhold or disconnect power under amended Article 89.108.9. Beyond that administrative remedy, violations of Title 15's electrical provisions are misdemeanors under Section 15.20.250.101, with every day of continued violation treated as a separate offense, plus administrative fines under Chapter 8.10.

Frequently Asked Questions

What electrical code does Vacaville enforce?
Vacaville has adopted the California Electrical Code, 2025 Edition, based on the 2023 National Electrical Code, under Municipal Code Section 15.20.256.010, along with local amendments in Section 15.20.256.020 covering submittals, unsafe buildings, grounding electrodes, and temporary service.
What documents do I need to submit for an electrical permit?
Article 89.108.4.3, as amended locally, requires bonding and grounding details, wiring plan runs, single-line diagrams, load calculations, wire sizing calculations, conduit sizing calculations, and derating calculations at the time you apply, or whenever the Building Official later asks for them.
Can Vacaville shut off my power over an electrical code violation?
Yes. Amended Article 89.108.9 lets the Building Official withhold or disconnect power from any building defined as dangerous or presenting a hazardous condition, separate from any other enforcement action the city takes.
Can I get temporary electrical service while building in Vacaville?
Section 590.1, as amended, allows temporary electrical service only during periods of construction or repair under a valid permit, or where the conditions of approval specifically authorize temporary service.

Sources & Official References

Other rules in Vacaville

All Vacaville rules

California rules heatmap·Compare Vacaville to another location·View the California building safety overview

Get notified when Electrical Permits in Vacaville, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Solano County handle electrical permits.

Vallejo, CA
Some Restrictions
Fairfield, CA
Some Restrictions