- Adopted code
- 2025 CA Electrical Code (2023 NEC base)
- Submittal required
- Load calcs, wiring diagrams at application
- Enforcement tool
- Building Official may disconnect power
- UFER ground
- Must be accessible via cover/access panel
- Temporary power
- Only during active construction permit
Summary
Vacaville enforces the 2025 California Electrical Code, based on the 2023 National Electrical Code, under Municipal Code Section 15.20.256.010. Local amendments require full construction documents, including bonding, grounding, and load calculations, at the time of permit application, and let the Building Official disconnect power from any building found dangerous.
Adopt the California Electrical Code (CEC), 2025 Edition, based on the 2023 National Electrical Code as published by the National Fire Protection Association (NFPA) and as adopted by the State Building Standards Commission in the California Code of Regulations, Title 24, Part 3. ... Article 89.108.4.3 – Plan review and time limitations is amended by adding the following: Submittal Documents. Construction documents for electrical work shall be provided at the time of the permit application or at any time, as determined by the Building Official. Such documents shall include, but not be limited to, bonding and grounding details; wiring plan runs and details, single line diagrams, load calculations, wire sizing calculations, conduit sizing calculations, and derating calculations.
Full Breakdown
The city adopted the CEC, 2025 Edition, as published by NFPA and adopted by the State Building Standards Commission, under Section 15.20.256.010, folding it into Title 24, Part 3 of the California Code of Regulations. Section 15.20.256.020 layers city-specific amendments onto that base code. Article 89.108.4.3 is amended so that construction documents for electrical work, covering bonding and grounding details, wiring plan runs, single-line diagrams, load calculations, wire sizing calculations, conduit sizing calculations, and derating calculations, must be submitted at the time of the permit application or whenever the Building Official later requires them.
Article 89.108.9 gives the Building Official authority to withhold or disconnect electrical power from any building the code defines as dangerous, or that presents another hazardous condition, independent of any separate abatement action. A newly added Article 250.52(A)(3)(3) requires a concrete-encased grounding electrode (a UFER ground) on new single-family dwellings to be accessible, either through an interior cover plate or an exterior weatherproof access panel positioned next to the electrode. Section 590.1 is amended so temporary electrical service can be authorized only during an active construction or repair permit, or where conditions of approval specifically allow temporary power.
Appeals of electrical permit decisions go to the same building appeals board structure used for the rest of Title 15: Section 15.20.250.100 adds subsection 89.108.8.3 to the CEC establishing a local appeals board mirroring the five-member Napa-Solano ICC panel.
Violations & Fines
Electrical work performed without a permit, or with the required submittal documents missing, exposes an owner to the Building Official's authority to withhold or disconnect power under amended Article 89.108.9. Beyond that administrative remedy, violations of Title 15's electrical provisions are misdemeanors under Section 15.20.250.101, with every day of continued violation treated as a separate offense, plus administrative fines under Chapter 8.10.
Frequently Asked Questions
What electrical code does Vacaville enforce?
What documents do I need to submit for an electrical permit?
Can Vacaville shut off my power over an electrical code violation?
Can I get temporary electrical service while building in Vacaville?
Sources & Official References
Other rules in Vacaville
California rules heatmap·Compare Vacaville to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Solano County handle electrical permits.