Kern County, CA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2025 California Electrical Code, Title 24 Part 3
- Permit exemptions
- Minor repairs, lamp replacement, plug-in portable equipment
- Accessory building exception
- 120 sq ft or less on same lot
- Unpermitted work penalty
- Double permit fee under Section 17.24.130
- Inspection rule
- No concealing or energizing before department approval
- Appeal path
- Board of Building Appeals, then Board of Supervisors
Summary
Installing, energizing or altering electrical equipment or wiring anywhere in unincorporated Kern County requires a permit from the building official under Section 17.24.090, with narrow exceptions for minor repairs and lamp replacement. A separate permit covers each building, unpermitted work doubles the fee, and utilities cannot legally energize wiring the county hasn't inspected.
17.24.090 - Permits required. It shall be unlawful for any person, firm, corporation, owner of the land, or possessor to install, energize, re-energize, use or maintain any electrical equipment or wiring system within or on any building, structure, or premises within the jurisdiction of the enforcing official, nor shall any alteration or addition be made thereto, without first securing a permit therefor from the building official, with the following exceptions: A.Minor repair work, the replacement of lamps or the connection of portable electrical equipment to suitable permanently installed receptacles;B.Electrical wiring expressly exempted from this chapter; (see Section 17.24.030).
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 59 Update 1).
Full Breakdown
090 makes it "unlawful for any person, firm, corporation, owner of the land, or possessor to install, energize, re-energize, use or maintain any electrical equipment or wiring system" without first securing a permit, exempting only minor repair work, lamp replacement, and connecting portable equipment to existing permanent receptacles. 100 requires a separate permit for each building, though a main dwelling's permit can also cover wiring for an accessory building of 120 square feet or less on the same lot when supplied from the main building.
150 requires two sets of plans (three outside the Bakersfield office) drawn no smaller than one-eighth inch to the foot. 190 bars anyone from energizing unapproved work and bars utilities from supplying power to a wiring system that hasn't been inspected, or where the meter or service drop has been removed, until the department approves it. 160's further right of appeal to the Board of Supervisors.
Violations & Fines
Section 17.24.130 doubles the permit fee for anyone who "commences any electrical work for which a permit is required... without first having obtained a permit," unless the building official finds it was urgent emergency work, in which case a permit must still follow as soon as practical or the double fee applies for unreasonable delay. Beyond the fee, Section 17.04.200's Title 17 misdemeanor penalty, up to $1,000 and six months in county jail, backs every electrical permit violation.
Frequently Asked Questions
Do I need a permit to rewire an outlet in unincorporated Kern County?
Can a small shed skip its own electrical permit?
What happens if I energize new wiring before it's inspected?
What if I start electrical work without getting a permit first?
Sources & Official References
Other rules in Kern County
California rules heatmap·Compare Kern County to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.