Logan, UT Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- National electrical code, incorporated by section 15.08.010
- Permit fees
- Set by resolution under section 15.08.020
- Public copy
- City recorder's office
- Flood zone equipment height
- Two feet above base flood elevation
- Penalty
- Class B misdemeanor, each day a separate offense
Summary
Logan City, Utah adopts the national electrical code in Chapter 15.08 of the Logan Municipal Code, and its provisions control within city limits. Electrical permit fees are adopted by resolution rather than printed in the code. The building safety division enforces Title 15, and a violation is a class B misdemeanor.
A. For the purpose of providing minimum standards to safeguarding persons and property from hazards arising from the use of electricity within the state pursuant to chapter 56, title 58 of Utah Code Annotated, and administrative rule making authority, the state of Utah through the Utah uniform building codes commission, has adopted statewide uniform technical construction codes, including amendments. The national electrical code, as adopted herein, is hereby fully incorporated, as if set out at length herein, and from the effective date of this chapter, the provisions thereof shall be controlling within the corporate limits of the city. B. Pursuant to section 10-3-711, Utah Code Annotated, 1953, as amended, the national electrical code is available for use and examination by the public in the city recorder's office. ... Electrical permit fees shall be as set forth in and adopted by resolution.
Full Breakdown
Chapter 15.08 has two sections. Section 15.08.010 states the purpose as providing minimum standards for safeguarding persons and property from hazards arising from the use of electricity. It rests the program on chapter 56, title 58 of the Utah Code Annotated and on the statewide uniform technical construction codes adopted by the Utah uniform building codes commission, then fully incorporates the national electrical code as if set out at length in the Logan Municipal Code. From the effective date of the chapter its provisions are controlling within the corporate limits of the city. Subsection B, citing section 10-3-711 of the Utah Code Annotated, makes the national electrical code available for use and examination by the public in the city recorder's office.
Section 15.08.020 handles the money: electrical permit fees are set forth in and adopted by resolution, so the chapter prints no dollar amounts. Sections 15.06.030 and 15.18.030 list section 15.08.020 beside the building, mechanical and plumbing fee sections when they tie permit fees to the valuation of the proposed project.
Other chapters add electrical rules that apply inside Logan. In a special flood hazard area, section 15.27.160(D) requires electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities to sit two feet (2') above the base flood elevation. Landlords must keep electrical facilities they supply in good and safe working order under section 15.25.050(O). Under section 15.25.110, after written notice the owner must begin repairing a nonfunctioning electrical system within twenty four (24) hours, an inoperable electric fixture within seventy two (72) hours, and an electrical disconnection caused by the owner within twenty four (24) hours.
Decisions of the building official on the technical codes go to the appeals board under chapter 15.22, and the building safety division carries the enforcement duty for all of Title 15.
Violations & Fines
Under section 15.22.080 a violation of Title 15 is a class B misdemeanor unless state or federal law or another provision says otherwise, and every day the violation is committed or permitted to continue is a separate offense. Section 15.22.090 lets the city enforce through the title 17 administrative hearing program or through civil or criminal actions, and the city alone decides which route to use.
Frequently Asked Questions
What electrical code does Logan, Utah follow?
How much does a Logan electrical permit cost?
Do flood zone rules affect electrical work in Logan?
How fast must a Logan landlord fix electrical failures?
Sources & Official References
Other rules in Logan
Compare Logan to another location·View the Utah building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.