Madison County, IL Building Safety: Electrical Permits (2026)
Key Facts
- Adopted electrical code
- 2005 National Electric Code
- Adoption section
- § 90.16(A)(4)
- Max fine
- $1,000, each day a separate offense
- Code copies on file
- County Clerk's office, 3 copies
- Enforcing office
- Planning and Development / Building and Zoning Dept.
Summary
Electrical work on construction in unincorporated Madison County must follow the 2005 National Electric Code, which the County Board adopted by reference alongside its building, residential, fire, mechanical and plumbing codes. The Building and Zoning Department keeps certified copies on file at the County Clerk's office for public inspection.
§ 90.16 BUILDING CODES AND REGULATIONS ADOPTED BY REFERENCE. (A) The following Codes are adopted by reference and made a parte hereof as if appearing in total: ... (4) 2005 National Electric Code;
Full Breakdown
§ 90.16 of the county's Building Regulations chapter adopts nine construction codes by reference "as if appearing in total," and the fourth on that list is the 2005 National Electric Code, which governs electrical installations for construction in unincorporated Madison County. The same section adopts the 2012 International Building Code, the 2012 International Residential Code (with two named exceptions), the 2012 International Fire Code, the 2009 International Energy Conservation Code, the 2012 International Mechanical Code, the Illinois Plumbing Code, the Illinois Private Sewage Code, and the 2012 International Property Maintenance Code, so electrical work sits inside a full adopted-code package rather than a standalone electrical ordinance. § 90.16(B) requires the county to keep three copies of every adopted code on file in the County Clerk's office for visual inspection, which is where a homeowner or contractor can review the actual 2005 NEC text referenced by the ordinance.
The county's authority to adopt these codes for unincorporated construction comes from § 90.15(A), citing 55 ILCS 5/5-6001 et seq. Electrical permitting sits alongside the general building-permit process in this chapter: Madison County's Planning and Development / Building and Zoning Department administers the permits and inspections, and a separate provision, § 93.161(D), requires that where a sign installation needs an electrical permit, it must be obtained at the same time as the sign permit itself.
Violations & Fines
Failing to wire construction to the adopted 2005 National Electric Code, or working without the required permit, is a violation of Chapter 90 under § 90.99: the maximum fine is $1,000, and each day the noncompliant wiring or unpermitted work continues after notice counts as a separate offense, so daily fines can stack quickly on an uncorrected job.
Frequently Asked Questions
What electrical code applies to construction in unincorporated Madison County?
Who enforces the electrical code in unincorporated Madison County?
What happens if electrical work doesn't meet the adopted code?
Sources & Official References
Other rules in Madison County
Compare Madison County to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.